Reviewed by a licensed Professional Engineer · NY, NJ, PA, MD, DE · Last reviewed · Code basis: NFPA 14 (2016 and 2019; edition referenced by the adopted IBC) Ch 3, 6, 7, 9; NFPA 13 (2019 PA and MD, 2022 NYS and NJ, 2025 DE) Ch 5, 16; NFPA 13 (2016, NYC) Ch 8, 24 as modified by Appendix Q; 2021 IBC 403.3, 903.4, 905, 912; 2022 NYC BC Appendix Q (Q102, Q105); NFPA 25 (2023) Ch 5, 6, 15

General guidance, not a code determination for any project. Confirm the adopted code and local amendments with the authority having jurisdiction.

A combined sprinkler and standpipe system is a standpipe system whose risers also feed the building’s automatic sprinklers, so the same risers, water supply, fire department connections (FDCs) and any fire pump serve both the firefighters’ hose valves and the sprinklers on every floor. The National Fire Protection Association (NFPA) standard for standpipe and hose systems, NFPA 14, defines the arrangement in Chapter 3 as a standpipe system in which one network of pipe serves both the hose connections and the automatic sprinklers.

Each floor takes its sprinklers off the riser through a floor control valve assembly, while the hose valve stays on the riser itself, so a floor’s sprinklers can be shut for work without taking the hose valve out of service. Most high-rise and many mid-rise buildings designed under current codes use the arrangement. Building staff often refer to the combined riser simply as the sprinkler riser, which hides the fact that it is sized and tested as a standpipe.

At a Glance: Combined Sprinkler and Standpipe System

  • Definition: a standpipe system whose risers supply both the hose connections and the automatic sprinklers, with a floor control valve assembly at each floor where the sprinkler piping leaves the riser.
  • Governing code and section: NFPA 14 Chapter 3 (definition), Chapter 6 (valves and connections) and Chapter 7 (riser size and system demand), in the edition the adopted building code references; NFPA 13, the sprinkler standard, for the floor control valve assemblies and the sprinkler piping (Chapter 16 in the 2022 edition); 2021 International Building Code (IBC) Sections 903 and 905; 2022 New York City (NYC) Building Code Appendix Q, which modifies NFPA 13 and NFPA 14 (2016).
  • Who prepares it or who it applies to: a fire protection engineer or the sprinkler contractor’s designer lays out the risers and checks the standpipe demand against the sprinkler demand; it applies to owners of buildings that need both sprinklers and a standpipe, most often high-rises.
  • When it’s required: no code requires the combination itself. The building code requires sprinklers and a standpipe as separate obligations, and NFPA 14 permits one set of risers to serve both.
  • Typical output: a riser diagram showing the combined risers, hose valves, floor control valve assemblies, FDC, fire pump and supervised valves, with a hydraulic calculation that compares the two demands.
  • Often confused with: separate standpipe and sprinkler risers in the same building, and a sprinkler system with hose connections taken from the sprinkler piping, which is not a standpipe.

What a Combined Sprinkler and Standpipe System Is

A combined system is a standpipe first. The riser is sized, supplied and calculated as a standpipe under NFPA 14, and the sprinkler system on each floor is a branch off that riser, designed under NFPA 13 like any other sprinkler system. The hose valves sit on the riser at each stair landing, and the sprinklers start from a separate valve assembly on the same riser.

The design logic is economy. A high-rise needs a standpipe in each exit stair and sprinklers on every floor, and running a second set of risers beside the standpipes duplicates pipe, valves, shaft space and in many cases a pump. One set of larger risers serves both, and the standpipe demand usually governs their size anyway.

Because the sprinklers need an automatic water supply under NFPA 13 (2022) Chapter 5, a combined riser is kept full of water and connected to the public main, a tank or a fire pump. The standpipe types the codes allow, and where a dry or manual standpipe is still permitted, are set out in which standpipe types the code allows: wet, dry or manual.

The two demands on a combined system are compared, not added. In a building sprinklered throughout, NFPA 14 Chapter 7 permits the standpipe demand (500 gpm for the most remote standpipe plus 250 gpm for each additional one, up to 1,000 gpm) to serve the sprinklers as well, and where the sprinkler demand including its hose stream allowance is larger, the water supply has to meet that larger demand. In a building that is only partly sprinklered, the same chapter adds a sprinkler allowance to the standpipe demand instead. The arithmetic, with a worked example, is in how to calculate standpipe demand and pressure.

What a Combined System Includes

A combined system adds a short list of sprinkler parts to the standpipe. The table names each component, what it does in the combined arrangement and where the codes address it, using NFPA 14 and NFPA 13 chapter references because paragraph numbers move between editions.

ComponentWhat it does in a combined systemWhere the code covers it
Combined riserThe vertical pipe in each exit stair that carries the standpipe flow and feeds the sprinkler connection on every floor. NFPA 14 sets 6 in. as the minimum for a combined riser and permits 4 in. where the building is sprinklered throughout and the system is hydraulically calculated.NFPA 14 Chapter 7 (size); Chapter 6 (installation)
Hose valvesThe 2 1/2 in. fire department outlets on the riser at each floor landing of the stair. They sit on the riser side of the floor control valve, so they stay in service when a floor’s sprinklers are shut.NFPA 14 Chapter 7; 2021 IBC Section 905.4
Floor control valveAn indicating valve on each floor’s sprinkler connection that isolates that floor’s sprinklers without draining the riser or closing the hose valves.NFPA 14 Chapter 6; NFPA 13 (2022) Chapter 16; 2021 IBC Section 903.4.3 for high-rise buildings
Check valveTraps the floor piping at its highest pressure, so a drop in riser pressure when a hose line opens or a pump stops does not move water back and forth past the waterflow switch.NFPA 13 (2022) Chapter 16
Waterflow switchDetects flow into that floor’s sprinklers and identifies the floor at the fire alarm control unit and the supervising station.NFPA 13 (2022) Chapter 16; 2021 IBC Section 903.4
Test and drain valveLets the inspector flow water through the floor assembly to prove the waterflow switch, and drains the floor’s piping for work, usually through a sight glass into a drain riser.NFPA 13 (2022) Chapter 16; NFPA 25 (2023) Chapter 5 for the tests
Fire department connection (FDC)The inlets outside the building that feed the base of the risers, so pumping into any of them supplies the hose valves and the sprinklers together.NFPA 14 Chapter 6; 2021 IBC Section 912
Fire pump, where usedRaises the supply to the pressure the most remote hose valve needs. On a combined system one pump serves both demands, and the standpipe demand usually sets its rating.NFPA 14 Chapter 9 (water supply); NFPA 20 for the pump
SupervisionElectrical supervision of every control valve in its normal open position and of every waterflow switch, reporting to the fire alarm system or a supervising station.2021 IBC Sections 903.4 and 905.9; NFPA 14 Chapter 6

The floor control valve assembly is the part that turns a standpipe into a combined system. NFPA 14 Chapter 6 gives each sprinkler connection off a combined riser its own control valve, and NFPA 13 (2022) Chapter 16 calls for a floor control valve, check valve, pressure gauge, main drain valve and flow switch on each floor of a building more than 2 stories tall (the 2019 edition lists the same items without the gauge), with limited exceptions. Manufacturers sell the pieces as one preassembled unit, usually with a sight glass, which is why the trade calls it an assembly.

Pressure is the other floor-level issue. On the lower floors of a tall combined system, the riser pressure needed to reach the top hose valve can exceed the 175 psi rating of standard sprinkler components. The floor connection then gets a pressure-reducing valve downstream of the floor control valve, or the floor is built with components rated for the higher pressure.

Figure 1: Anatomy of a Combined Riser

Floor 5Floor 4Floor 3Floor 2Floor 1Grade Exit stair PUMP From public main 123456789123456789 Key Floor control valve(supervised)Check valveWaterflow switchTest and drain valveHose valve at eachstair landingCombined riser ineach exit stairRiser control valve(supervised)Fire pump, where themain falls shortFDCs: feed hoseand sprinklers Hose valves sit on the riser side of each floor control valve, so shutting one floor’ssprinklers leaves the hose valves and every other floor in service.
Each floor of a combined system takes its sprinklers off the standpipe riser through its own supervised control valve, check valve, waterflow switch and test and drain valve, while the 2 1/2 in. hose valve stays on the riser side. The fire pump and the fire department connections both feed the base of the riser, so each serves the hose valves and the sprinklers at once.

Opens the Project Desk with your sentence. Our licensed PEs review every brief and reply within one business day.

Where the Code Defines a Combined System

NFPA 14 holds the definition and the riser rules. Chapter 3 defines a combined system, Chapter 6 covers the valves, the sprinkler connections and the FDC, and Chapter 7 sets the minimum riser size and the demand rule for a building sprinklered throughout, in both the 2016 and 2019 editions.

NFPA 13 governs everything downstream of the floor control valve. The sprinkler piping, the spacing and density, and the floor control valve assembly itself follow the sprinkler standard, which places the installation of piping and valves in Chapter 16 of the 2022 edition. The sprinkler hydraulic calculation is run to NFPA 13 first, then compared with the standpipe demand.

The building code supplies the triggers and the supervision rules. In the 2021 IBC, Section 903 requires the sprinklers, Section 903.4 requires valve supervision and waterflow alarms, and Section 903.4.3 requires a supervised indicating control valve at the riser connection on each floor of a high-rise. Section 905 requires the standpipe, and Section 905.9 requires the valves controlling its water supply to be supervised open.

New York City modifies both standards through 2022 NYC Building Code Appendix Q, which names NFPA 13 (2016) in Section Q102.1 and NFPA 14 (2016) in Section Q105.1. For combined systems, the modified NFPA 14 allows the smaller riser only in fully sprinklered, hydraulically calculated buildings whose floors are less than 150 ft above the lowest level of fire department vehicle access (Section 7.6.2.1). Section 7.6.1 as modified requires every standpipe in a building with floors more than 150 ft above grade plane to be at least 6 in.

Appendix Q also deletes the words that bring the hose stream into the sprinkler side of the NFPA 14 comparison (Section 7.10.1.3.1.1), so in New York City the standpipe demand is compared with the sprinkler demand alone. FDC caps on a combined system are painted yellow and the connection is marked “COMBINATION STANDPIPE AND SPRINKLER SYSTEMS” (Sections 4.8.3 and 6.4.5.2). Valves controlling sprinklers fed from the standpipe have to be listed for standpipe service in their pressure zone and sit ahead of any pressure-reducing valve (NFPA 13 (2016) Section 8.16.1.1.1.8 as modified).

Outside New York City, the NFPA 13 and NFPA 14 editions follow the building code each state adopted, through the referenced standards in IBC Chapter 35. New York State and New Jersey apply NFPA 13 (2022) under the 2024 International Codes (I-Codes), and Pennsylvania applies NFPA 13 (2019) under the 2021 IBC. In Maryland, the county building permit reviews sprinklers to NFPA 13 (2019) through the 2021 IBC, while the State Fire Prevention Code (NFPA 1, 2024) references NFPA 13 (2022). Delaware applies NFPA 13 (2025) through Regulation 701 and approves fire protection through State Fire Marshal plan review.

JurisdictionAdopted code; NFPA 13 and NFPA 14 editionsAuthority having jurisdiction (AHJ)Filing or permit
New York State (outside NYC)2025 Uniform Code based on the 2024 I-Codes; NFPA 13 (2022); NFPA 14 in the edition referenced by the 2024 I-CodesLocal code enforcement officialBuilding permit with sealed sprinkler and standpipe drawings
New York City2022 NYC Building Code Chapter 9 and Appendix Q; NFPA 13 (2016) and NFPA 14 (2016) as modified, including the 150 ft limit on 4 in. combined risers and the yellow “COMBINATION STANDPIPE AND SPRINKLER SYSTEMS” FDCDepartment of Buildings (DOB) for plan review; Fire Department of the City of New York (FDNY) for fire code complianceDOB NOW: Build sprinkler and standpipe work types
New JerseyUniform Construction Code (UCC), 2024 I-Codes effective August 17, 2026; NFPA 13 (2022); NFPA 14 in the edition referenced by the 2024 I-Codes; Uniform Fire Code (2018 International Fire Code basis) for existing buildingsMunicipal fire protection subcode officialConstruction permit, fire protection subcode technical section
PennsylvaniaPennsylvania UCC, 2021 I-Codes effective January 1, 2026; NFPA 13 (2019); NFPA 14 in the edition referenced by the 2021 IBC; no statewide fire codeMunicipal or third-party code official; Department of Licenses and Inspections (L&I) in PhiladelphiaMunicipal building permit with fire protection plans
Maryland2021 IBC through the county building code, with NFPA 13 (2019) and NFPA 14 in the edition referenced by the 2021 IBC; State Fire Prevention Code on NFPA 1 (2024), which references NFPA 13 (2022)County building official; State or local fire marshalCounty building permit; fire marshal plan review as the AHJ’s policy directs (Code of Maryland Regulations (COMAR) 29.06.01.08)
DelawareRegulation 701 (2026) with NFPA 1 (2024) and NFPA 13 (2025); NFPA 14 in the edition NFPA 1 (2024) references; IBC by county (2021 in New Castle and Sussex, 2018 in Kent and Wilmington)Office of the State Fire Marshal; county building officialState Fire Marshal plan review before the county building permit (1 Del. Admin. Code 701)

Editions as of November 2026. Local amendments other than New York City’s Appendix Q are not shown.

How a Combined System Differs From Separate Risers and Sprinkler-Fed Hose Valves

Two arrangements look like a combined system on a riser diagram and are not one. The first is a building with separate standpipe and sprinkler risers: the standpipes carry only hose flow, and the sprinklers have their own riser, usually smaller, with its own floor control valves and its own hydraulic calculation. The second is a sprinkler system with hose connections taken off the sprinkler piping, which NFPA 13 (2022) Chapter 16 permits in limited cases but which is designed to the sprinkler demand and is not a standpipe.

Figure 2: Combined, Separate or Sprinkler-Fed Hose: Side by Side

FeatureCombined systemSeparate standpipe and sprinkler risersSprinkler system with hose connections
What the riser carriesHose flow and sprinkler flow in the same pipeHose flow only in the standpipe; sprinkler flow in its own riserSprinkler flow, with a hose allowance drawn from sprinkler piping
Governing standardNFPA 14 for the riser; NFPA 13 downstream of each floor control valveNFPA 14 for the standpipes; NFPA 13 for the sprinkler riser and floorsNFPA 13 only
Minimum riser size6 in., or 4 in. where sprinklered throughout and hydraulically calculated (NFPA 14 Chapter 7)Standpipe 4 in. (NFPA 14 Chapter 7); sprinkler riser set by the sprinkler calculationSet by the sprinkler calculation
Design demandThe larger of the standpipe demand and the sprinkler demand with hose, in a building sprinklered throughout (NFPA 14 Chapter 7)Each system calculated on its own; a shared pump or tank is checked against bothSprinkler demand plus the NFPA 13 hose allowance
Floor control valve assembliesOn the standpipe riser at each floorOn the sprinkler riser; the standpipe has noneOn the sprinkler riser
Fire department connectionThe same FDCs feed bothSeparate FDCs, or a shared one where the fire department accepts itThe sprinkler FDC
Meets a building code standpipe requirementYesYes, through the standpipeNo
Typical buildingHigh-rise and mid-rise office, residential and hotel towersLow-rise buildings, buildings with a dry or manual standpipe, and additions on an existing sprinkler riserWarehouses and light or ordinary hazard buildings with no standpipe requirement
A combined system carries hose and sprinkler flow on one NFPA 14 riser sized at 6 in., or 4 in. where the building is sprinklered throughout and the system is hydraulically calculated. Separate risers split the two flows, and hose connections taken from sprinkler piping under NFPA 13 do not make a standpipe.

The practical test is the riser calculation. If the riser was sized and calculated for the NFPA 14 standpipe demand and the sprinklers branch off it through floor control valve assemblies, the system is combined. If the riser was sized for the sprinkler demand and hose valves were added later, it is a sprinkler system with hose connections, and the added valves do not turn it into a standpipe.

Hose connections on sprinkler piping do not meet the flow and pressure NFPA 14 requires of a Class I standpipe, so they cannot stand in for the standpipe the building code requires. DGA’s explainer on what a standpipe system is and how NFPA 14 Classes I, II and III differ covers the standpipe side of the comparison.

When a Combined System Is Required

No code requires the combination itself. The building code requires sprinklers and a standpipe as separate obligations, and NFPA 14 permits one set of risers to serve both; the designer chooses the combined arrangement because it saves pipe, valves and shaft space. Most high-rises use it, since a high-rise has to be sprinklered throughout under 2021 IBC Section 403.3 and needs a standpipe in every exit stair.

The standpipe triggers, including the height above fire department vehicle access and the story count in 2021 IBC Section 905.3.1, are set out in when a building needs a standpipe under IBC 905.3. In a building more than 420 ft tall, 2021 IBC Section 403.3.1 requires each sprinkler zone to be fed by at least 2 risers, each supplying sprinklers on alternate floors, and combined risers in separate stairs often fill that role. In New York City, Appendix Q permits combined systems in occupancy Groups A, B, E, F, I, M, R and S (NFPA 13 (2016) Section 24.2.5.2 as modified).

Common Misconceptions

“Shutting a floor’s sprinkler valve shuts the hose valve.” No. The hose valve is on the riser side of the floor control valve, so isolating one floor’s sprinklers for a tenant fit-out leaves the hose valve live. Shutting a riser control valve is different: it takes the hose valves and every floor’s sprinklers on that riser out of service, which NFPA 25 (2023) Chapter 15 treats as an impairment.

“Every combined riser has to be 6 in.” Not always. NFPA 14 Chapter 7 permits a 4 in. riser where the building is sprinklered throughout and the system is hydraulically calculated, and New York City keeps that allowance only where floors are less than 150 ft above fire department vehicle access.

Who Needs to Act

WhoOne action
OwnerKeep the combined system on both the NFPA 25 (2023) Chapter 5 sprinkler schedule and the Chapter 6 standpipe schedule, because one riser is tested under both.
Tenant contractorClose only the floor control valve for the tenant’s floor, and report the impairment before the work starts.
ArchitectReserve room at each stair landing for the hose valve, the floor control valve assembly and the drain riser.
Fire protection engineerRun the standpipe demand and the sprinkler demand, use the larger in a building sprinklered throughout, and check the lower floors against the sprinkler component pressure rating.

Key Takeaway: A combined sprinkler and standpipe system is a standpipe whose risers also feed the sprinklers, through a floor control valve assembly with a check valve, waterflow switch and test and drain on each floor. NFPA 14 defines it in Chapter 3, and Chapter 7 sets the minimum riser size and lets the standpipe demand cover the sprinklers in a building sprinklered throughout unless the sprinkler demand with hose is larger. The same FDCs and any fire pump serve both, and New York City adds its own riser size, demand and FDC marking rules through Appendix Q.

Frequently Asked Questions

Is a combined sprinkler and standpipe system the same as a sprinkler riser?

No. The riser of a combined system is a standpipe sized and calculated to NFPA 14 for the hose demand, and each floor’s sprinklers branch off it through a floor control valve assembly. A sprinkler riser is sized for the sprinkler demand alone, and adding hose valves to it does not make it a standpipe.

Does a combined system have to meet the sprinkler and standpipe demands at the same time?

Conditional: not in a building sprinklered throughout, where NFPA 14 Chapter 7 permits the standpipe demand to serve the sprinklers as well and the supply has to meet the sprinkler demand including hose only where that figure is larger. In a building that is only partly sprinklered, NFPA 14 Chapter 7 adds a sprinkler allowance to the standpipe demand instead. In New York City, Appendix Q leaves the hose stream out of the sprinkler side of the comparison.

What size does a combined standpipe riser have to be?

Conditional: NFPA 14 Chapter 7 sets 6 in. as the minimum for a combined riser and allows 4 in. where the building is sprinklered throughout and the system is hydraulically calculated. New York City allows the smaller riser only where floors are less than 150 ft above the lowest level of fire department vehicle access, and requires the larger size in buildings with floors more than 150 ft above grade plane.

Can one floor’s sprinklers be shut off without disabling the standpipe?

Yes. Each sprinkler connection off a combined riser has its own control valve, and the hose valve sits on the riser side of it, so a floor’s sprinklers can be isolated for work while the hose valve stays in service. Shutting a riser control valve is different, because it takes the hose valves and every floor’s sprinklers on that riser out of service.

Which buildings use combined systems?

Most high-rises and many mid-rise buildings that need both sprinklers and a standpipe, because one set of risers in the exit stairs serves both. In New York City, Appendix Q permits combined systems in occupancy Groups A, B, E, F, I, M, R and S.

This article is general information, not a substitute for a project-specific code analysis. Code editions, local amendments and reviewer practice change; confirm the adopted code and the authority having jurisdiction for each project.

Planning a Combined Riser?

Send the building height, the number of stairs, the occupancy and the jurisdiction, with a flow test if one exists. DGA sizes the combined risers, checks the standpipe demand against the sprinkler demand and lays out the floor control valve assemblies. Project briefs get confirmation and preliminary code feedback within one business day.

Send a Project Brief → View Standpipe Design Services

Leave a Reply

Your email address will not be published. Required fields are marked *

Quick inquiry

Ready when you are.

Your name, a way to reach you, and where the project is. One of our licensed PEs replies within one business day. No sales calls.

Prefer to describe it first? Open the Project Desk