In Delaware, the Office of the State Fire Marshal reviews the site plan, the building plans and each fire protection system plan before construction starts, under the Delaware State Fire Prevention Regulations (DSFPR, 1 Del. Admin. Code 701, 2026 edition), while the county or city issues the building permit under its own building code. Submittals go on paper to one of three county divisions, each system gets its own application, and the State Fire Marshal witnesses the hydrostatic test and performs the acceptance test before the building is occupied.

This article is for owners, architects and design teams with a project in Delaware. It covers what the regulations require, how they change the model National Fire Protection Association (NFPA) codes, which office reviews, what each submittal contains, and what happens between approval and occupancy. Cities whose fire marshal holds exclusive jurisdiction follow a separate path, covered briefly at the end.

At a Glance: Delaware State Fire Marshal Plan Review

  • Jurisdiction: the State of Delaware outside the cities whose fire marshal holds exclusive jurisdiction under Title 16 of the Delaware Code (16 Del.C.), section 6612(c).
  • Local code and edition: Delaware State Fire Prevention Regulations, 2026 edition (1 Del. Admin. Code 701 to 710), effective January 1, 2026, adopting NFPA 1 and NFPA 101 (2024), NFPA 13 (2025), NFPA 20 (2025), NFPA 72 (2025) and NFPA 25 (2023) in 701 section 3.1. The International Building Code (IBC) is adopted separately by each county and by Wilmington.
  • Agency (authority having jurisdiction, AHJ): the Office of the State Fire Marshal, through its New Castle, Kent and Sussex divisions; the State Fire Prevention Commission hears appeals and variances.
  • Filing or permit name: Site Application, New Building Application or Tenant Fit Out/Renovation/Occupancy Change Application, Preliminary Sprinkler Form, Water Based Fire Suppression System Application and Fire Alarm Installation Application, filed on paper with a check.
  • Key difference from the model code: Delaware deletes NFPA 1 Chapter 1 except section 1.13 (701 section 3.2.1.1), so plan review, permits and licensing come from the DSFPR itself, and fire protection system plans must be signed by a State Fire Marshal licensed company’s certificate holder.
  • Review time range (as of November 2026): none published. Regulation 701 sets no plan review clock, and the State Fire Marshal’s plan review pages and forms state no turnaround.

What Delaware Requires: State Fire Marshal Approval Alongside the Building Permit

A Delaware project answers to two separate reviews. The county or city building official reviews the building under its adopted IBC, and the Office of the State Fire Marshal reviews the same project against the NFPA-based DSFPR. Under 701 section 1.5.1.2 and 16 Del.C. 6612(l)(1), the State Fire Marshal reviews all plans and specifications before construction, except in political subdivisions that hold exclusive jurisdiction under section 6612(c).

The State Fire Marshal’s submittal pages set out which work needs which review. A site plan is needed for a new building or addition, a change of use, work that affects the footprint, or a subdivision, and it must be approved before the building. Building plans are needed for new structures, tenant fit-outs, renovations, occupancy changes and day-care occupancies. A new, added or changed fire alarm, sprinkler, standpipe, fire pump, non-water-based suppression or kitchen hood system needs its own system submittal, and a new system needs the building plans submitted first.

Plan review fees are capped by statute and published on the State Fire Marshal’s forms. As of November 2026, site plans are a flat $150, and building and system plans are 0.7% of construction cost up to $1,000,000, then $7,000 plus 0.3% of the amount over $1,000,000, with a $150 minimum (State Fire Marshal application forms; 16 Del.C. 6612(l)(3)). The statute also requires reduced fees for low life hazard occupancies such as warehouses and exempts projects more than 50% state-financed, among others (6612(l)(2)).

How Delaware’s Regulations Differ From the Model NFPA Codes

The DSFPR adopts NFPA documents only. Regulation 701 adopts no International Fire Code (IFC), and its section 3.2 amends NFPA 1 and NFPA 101 in ways that change how a project is approved. The table lists the differences a design team meets first.

TopicNFPA 1 and NFPA 101 (2024) as publishedDelaware, 1 Del. Admin. Code 701 (2026 edition)
Administration, permits and plan reviewNFPA 1 Chapter 1 sets the AHJ’s authority, plan review and permitsSection 3.2.1.1 deletes all of Chapter 1 except section 1.13; section 3.2.1.2 rewrites 1.13.1 so any permit NFPA 1 calls for is governed by the Delaware regulations; plan review runs under 701 section 1.5.1.2 and Regulation 701A
Building code linkNFPA 1 section 10.1.3 ties new construction to the building codeSection 3.2.1.4.2 deletes 10.1.3, and section 3.2.1.4.1 requires new buildings to comply with NFPA 101
Deleted chaptersNFPA 1 Chapters 17 and 33 apply where adoptedBoth chapters deleted in full (sections 3.2.1.7 and 3.2.1.10)
Referenced standardsEditions referenced by NFPA 1 (2024), for example NFPA 13 (2022)Section 3.1 adopts its own editions: NFPA 13 (2025) in 3.1.7, NFPA 20 (2025) in 3.1.17, NFPA 25 (2023) in 3.1.20, NFPA 72 (2025) in 3.1.44; the State Fire Marshal may accept a newer edition that gives equivalent safety
NFPA 101 amendmentsOccupancy chapters as publishedSection 3.2.6 amends NFPA 101 on corridor smoke detection in lodging houses, fire alarm and corridor smoke detection in new apartment buildings, and small residential board and care features
Alternatives, variances, appealsEquivalency and appeals in NFPA 1 Chapter 1The State Fire Marshal decides alternatives (section 1.7); appeals go to the State Fire Prevention Commission within 45 days (section 1.8.2); the Commission decides variances (section 1.9)
Contractor licensingLeft to the AHJ (certificates of fitness in NFPA 1 Chapter 1)Fire alarm and fire suppression companies hold an annual State Fire Marshal license and employ a qualified certificate holder (Regulation 703 Chapters 4 and 5)

Two of these rows shape every submittal. Because NFPA 1 Chapter 1 is gone, the forms, fees and signature rules come from the State Fire Marshal and Regulation 701A (Permits and Submissions), which is new in the 2026 edition. And because Delaware adopts NFPA 13 and NFPA 72 in their 2025 editions, the system plans are drawn to newer editions than most neighboring states use. Under 701 section 1.1.2, a stricter local rule can still govern if it is consistent with the DSFPR.

The same NFPA 1 basis drives storage approvals, which DGA’s article on how Maryland and Delaware regulate high-piled storage covers under NFPA 1 Chapter 34.

Who Reviews Delaware Fire Protection Plans, and Which Office

The Office of the State Fire Marshal takes submittals at three county divisions. The project’s county decides the office, and every division accepts the same forms and fee schedule. As of November 2026, no electronic portal is named on any State Fire Marshal submittal page or form.

DivisionOffice locationContact (as published, November 2026)
New Castle Division2307 MacArthur Road, New CastleTechnical Services, 302-323-5365
Kent Division and headquarters1537 Chestnut Grove Road, Dover302-739-4394
Sussex Division22705 Park Avenue, Georgetown302-856-5298

The building permit itself comes from the county or, in Wilmington, the city. That review follows the building code each jurisdiction adopted, which is why a Delaware project carries an IBC code analysis for the building official and an NFPA 101 analysis for the State Fire Marshal. State Fire Marshal decisions are appealed to the State Fire Prevention Commission, not to the county.

How to File: Site and Building Plans, Then Separate System Submittals

Delaware plan review runs in order. The site plan comes first, the building plans follow, and each fire protection system is filed as its own application once the building plans are in. Submittals are on paper: one scaled copy of each building or system plan, two copies of each site plan, and payment by check, money order or cashier’s check to the State of Delaware.

SubmittalContentsWho prepares or signsWhen
Site plan (Site Application)Two copies; flat $150 feeThe project’s design professionalFirst; required before approval of any new, addition or shell and core building
Building plans (New Building Application, Tenant Fit Out/Renovation/Occupancy Change Application or Day-Care Occupancies Application)One scaled copy of each plan; county tax parcel number; fee on construction costThe design team; the applicant signs and dates the applicationAfter the site plan, before construction
Preliminary Sprinkler FormHazard classifications on a floor plan, storage data, system type (NFPA 13, 13R, 13D, 14), fire pump and standpipe, concealed spaces; a water flow test from the past 12 months with an N^1.85 graph and the underground layoutA licensed sprinkler contractor or a Delaware registered professional engineer (PE)With the building plans, for any new sprinklered building
Fire pump electrical approvalApproval from a licensed electrical inspection agency of the electrical plans for a new electric-motor fire pumpElectrical engineer; the agency approvesWith the building plans, before the fire pump plans
Water Based Fire Suppression System ApplicationSprinkler, standpipe and fire pump plans; every page carries the company name, State Fire Marshal license number, and the certificate holder’s name, certificate number and signatureThe licensed fire suppression company’s certificate holderAfter the building plans are submitted
Fire Alarm Installation ApplicationPlans drawn to NFPA 72 with battery and voltage drop calculations, sound pressure levels and riser and pathway diagrams; the monitoring company’s license number if monitoredThe licensed fire alarm company’s certificate holderAfter the building plans are submitted
Other system applicationsNon-water-based suppression, kitchen hood suppression, hood duct and tank workThe licensed company for that systemAs the work is designed

The flow test on the Preliminary Sprinkler Form must be no more than 12 months old; DGA’s article on how current a flow test must be and who can perform one explains what reviewers accept. Phased building permits need phased system permits, and each phase is filed and closed on its own.

The signature rule matters most to out-of-state teams. The State Fire Marshal licenses fire alarm and fire suppression companies every year, and each company must employ a full-time certificate holder qualified for the work (Regulation 703 Chapters 4 and 5; Licensing Applicant Guide, July 2026). Regulation 703 recognizes a Delaware registered PE as qualified to be a certificate holder for most suppression classes, but a contractor without a State Fire Marshal license cannot sign the system plans.

Opens the Project Desk with your sentence. Our licensed PEs review every brief and reply within one business day.

Delaware Review Time, Inspections and the Final Before Occupancy

Delaware publishes no plan review time. As of November 2026, the 2026 text of Regulation 701 sets no review clock, and the State Fire Marshal’s plan review page, submittal pages, application forms and division pages state no turnaround. Schedules therefore rest on submittal completeness and sequence, and DGA’s Fire Protection Timeline Estimator gives a planning range by project type. For how the published clocks compare across the region, see DGA’s guide to fire protection plan review times by state.

Figure 1: Delaware State Fire Marshal Review: Site Plan to Occupancy

1. Site planSite Application, two copies, flat $150; approved before any new, addition or shell and core building
2. Building plansNew Building or Tenant Fit Out application with the Preliminary Sprinkler Form and any fire pump electrical approval; fee at 0.7% of cost up to $1,000,000
3. System submittalsWater Based Fire Suppression and Fire Alarm applications, signed by the licensed company’s certificate holder
4. Rough-in testsState Fire Marshal witnesses the hydrostatic test, scheduled before close-in
5. Acceptance test and finalState Fire Marshal acceptance test before the structure or tenant space is occupied; the general contractor calls the final
6. Service lifeAnnual Certificate of Inspection for each system, $25 per system from January 1, 2026
Delaware fire protection approval runs in a fixed order: the site plan is approved before the building, a new system is filed only after the building plans, the hydrostatic test is witnessed before close-in, and the State Fire Marshal performs the acceptance test before the structure or tenant space is occupied.

For water-based systems, the State Fire Marshal witnesses the hydrostatic test, which must be scheduled before the piping is closed in. Underground mains need the Material and Test Certificate for Underground Pipe, and aboveground piping needs the Contractor’s Material and Test Certificate at the acceptance test. The State Fire Marshal performs the acceptance test before the structure or tenant space is occupied.

The general contractor calls for the final inspection, except on a standalone system permit. Once a permit is finaled, it is closed. After occupancy, each system needs an annual Certificate of Inspection filed through a licensed vendor (Regulation 703 Chapter 1), with a $25 fee per system from January 1, 2026.

The 2026 edition applies to projects submitted on or after December 31, 2025, according to the State Fire Marshal’s December 2025 notice, and Regulation 701 took effect January 1, 2026 (section 1.2). A decision the design team disputes is appealed to the State Fire Prevention Commission within 45 days (701 section 1.8.2), and a request for an alternative goes to the State Fire Marshal under section 1.7.

Figure 2: Delaware vs Maryland: Fire Protection Plan Review

ItemDelawareMaryland
Fire codeDSFPR 2026 edition (1 Del. Admin. Code 701), NFPA 1 and 101 (2024), effective January 1, 2026State Fire Prevention Code (Code of Maryland Regulations, COMAR, 29.06.01), NFPA 1 and 101 (2024), effective June 23, 2025
Building codeIBC adopted by each county and by WilmingtonMaryland Building Performance Standards, 2021 IBC, enforced through the county permit
NFPA 13 edition2025 (701 section 3.1.7)2019 through the county permit; NFPA 1 (2024) references 2022
Where filing startsState Fire Marshal division for the county, on paperCounty permit office, which supplies the Fire Marshal Plan Review form
Who reviews fire protectionOffice of the State Fire Marshal, or a city fire marshal with exclusive jurisdictionOffice of the State Fire Marshal Engineering Services, or a county or municipal fire official
Published review timeNoneNone from the State Fire Marshal; some counties publish their own
Plan review fee basis0.7% of cost to $1,000,000, 0.3% above, $150 minimum (16 Del.C. 6612(l)(3))COMAR 29.06.04, invoiced by the State Fire Marshal; local fee ordinances where adopted
NFPA 1 permitsChapter 1 deleted except 1.13; permits governed by the Delaware regulationsSection 1.12 (Records and Reports) deleted; section 1.13 permits discretionary under the AHJ’s policies (COMAR 29.06.01.08)
AppealsState Fire Prevention Commission, within 45 days (701 section 1.8.2)State Fire Prevention Commission
Delaware and Maryland both enforce NFPA 1 and NFPA 101 (2024), but Delaware files fire protection plans directly with the State Fire Marshal and designs sprinklers to NFPA 13 (2025), while Maryland starts at the county permit office and reviews sprinklers to NFPA 13 (2019) through the 2021 IBC. Neither State Fire Marshal publishes a plan review time.

In Maryland, the county building permit reviews sprinklers to NFPA 13 (2019) through the 2021 IBC, while the State Fire Prevention Code (NFPA 1, 2024) references NFPA 13 (2022). A team working both sides of the state line should expect different editions, a different starting office and different forms. DGA’s guide to how fire protection plan review works in Maryland covers the Maryland side.

Where a City Fire Marshal Reviews Instead of the State Fire Marshal

Under 16 Del.C. 6612(c), a political subdivision’s fire marshal whose office was created by ordinance or resolution before January 1, 1959 serves as an Assistant State Fire Marshal and holds exclusive jurisdiction to use the State Fire Marshal’s powers in that subdivision. Regulation 701 section 1.5.1.2 excludes those subdivisions from State Fire Marshal plan review. The State Fire Marshal lists four jurisdictional city fire marshals: Dover, Newark, the City of New Castle and Wilmington.

The Wilmington Fire Marshal’s Office runs its own fire protection plan review, with its own application and fees, and sends projects outside the city to the State Fire Marshal. Fire protection contractors working in Wilmington still need a State Fire Marshal license, and appeals still go to the State Fire Prevention Commission. For a project in Dover, Newark or the City of New Castle, the design team confirms with that city’s fire marshal which submittals it reviews before filing anything with the state division.

Key Takeaway: Delaware fire protection approval runs through the Office of the State Fire Marshal, not the county building department: site plan first, then building plans with the Preliminary Sprinkler Form, then a separate application for each system signed by a State Fire Marshal licensed company’s certificate holder, all on paper, under the 2026 DSFPR (NFPA 1 and 101, 2024; NFPA 13 and 72, 2025). No review time is published as of November 2026, and the acceptance test comes before occupancy.

Frequently Asked Questions

Does the Delaware State Fire Marshal review sprinkler shop drawings?

Yes. Sprinkler, standpipe and fire pump plans go to the Office of the State Fire Marshal on a separate Water Based Fire Suppression System Application after the building plans are submitted, and every page must carry the licensed company’s name and license number and the certificate holder’s name, certificate number and signature. Inside Wilmington, the Wilmington Fire Marshal’s Office reviews them instead.

Which NFPA 13 edition does Delaware use?

NFPA 13 (2025). The 2026 Delaware State Fire Prevention Regulations adopt it in 1 Del. Admin. Code 701 section 3.1.7, effective January 1, 2026, and the State Fire Marshal may accept a newer edition as an alternative where it gives equivalent safety.

Does Delaware issue NFPA 1 permits?

No. Regulation 701 section 3.2.1.1 deletes NFPA 1 (2024) Chapter 1 except section 1.13, and section 3.2.1.2 rewrites 1.13.1 so any permit NFPA 1 calls for is governed by the Delaware regulations. Delaware issues its own licenses and permits, and construction approval comes through State Fire Marshal plan review.

Who reviews plans in Wilmington?

The Wilmington Fire Marshal’s Office. It runs its own fire protection plan review with its own application and fees, and Regulation 701 section 1.5.1.2 excludes subdivisions with exclusive jurisdiction under 16 Del.C. 6612(c) from State Fire Marshal plan review. Projects outside the city go to the State Fire Marshal.

How long does Delaware State Fire Marshal plan review take?

No published figure exists. As of November 2026, Regulation 701 sets no plan review clock, and the State Fire Marshal’s plan review pages, forms and division pages state no turnaround.

This article is general information, not a code determination for any project. Regulations, forms, fees and State Fire Marshal practice change; confirm the adopted code and the authority having jurisdiction for the project.

Filing Plans With the Delaware State Fire Marshal?

Send the site address, the county, the scope and the systems involved. DGA confirms which office reviews, prepares the NFPA 101 code analysis and the fire protection documents, and checks the submittal sequence before it goes in. Project briefs get confirmation and preliminary code feedback within one business day.

Send a Project Brief → View Code Consulting Services

Leave a Reply

Your email address will not be published. Required fields are marked *

Quick inquiry

Ready when you are.

Your name, a way to reach you, and where the project is. One of our licensed PEs replies within one business day. Every inquiry is confidential.

Prefer to describe it first? Open the Project Desk