Approvals by Jurisdiction · Jurisdiction

How Do Baltimore City and County Approve Fire Protection?

General guidance, not a code determination for any project. Confirm the adopted code and local amendments with the authority having jurisdiction.

Baltimore City approves fire protection work through the Department of Housing and Community Development (DHCD) ePlans system, where the Baltimore City Fire Department (BCFD) Office of the Fire Marshal reviews the plans against the City’s own fire code, the 2021 International Fire Code (IFC), while Baltimore County issues a sprinkler permit and a separate electrical permit for commercial fire alarm systems through its Department of Permits, Approvals and Inspections (PAI) and enforces a county fire code built on National Fire Protection Association (NFPA) 1 and NFPA 101 (2024). Both jurisdictions build to the 2021 International Building Code (IBC) as of November 2026.

The two Baltimores share a name and a building code, and little else on the fire side. This article sets out what each one has adopted, how each differs from the Maryland state baseline, who reviews the plans, how to file, and what review times and inspections each publishes. The statewide picture, including counties where the Office of the State Fire Marshal (OSFM) does the review, is covered in DGA’s article on how fire protection plan review works in Maryland.

At a Glance: Baltimore City and Baltimore County Fire Protection Approvals

  • Jurisdiction: Baltimore City and Baltimore County, Maryland, two separate governments with separate permit offices and fire departments.
  • Local code and edition (as of November 2026): Baltimore City: the Building, Fire, and Related Codes of Baltimore City (2024 Edition) under Ordinance 24-341, with the 2021 IBC and the 2021 IFC as the Baltimore City Fire Code. Baltimore County: the 2021 IBC under County Bill 49-24, effective September 3, 2024, and NFPA 1 and NFPA 101 (2024) under County Bill 73-26, effective October 4, 2026.
  • Agency (authority having jurisdiction, AHJ): Baltimore City: DHCD for permits and the BCFD Office of the Fire Marshal for fire protection plan review and inspection. Baltimore County: PAI for permits and plan review, and the Baltimore County Fire Marshal’s Office for inspections and the county fire code.
  • Filing or permit name: Baltimore City: permit application in DHCD’s ePlans portal, referred to BCFD, with an optional Expedited Third-Party Plan Review for listed scopes. Baltimore County: Commercial or Residential Sprinklers Permit, filed in PAI’s online permit portal, and a separate electrical permit for a commercial fire alarm system.
  • Key difference from the model code: Baltimore City is the one Maryland jurisdiction where the State Fire Prevention Code largely does not apply, so its fire code is the IFC rather than NFPA 1, and it requires a third-party Fire and Life Safety Design Evaluation (FLSDE) for high-rise, large assembly, high-hazard, institutional and new hotel and apartment projects. Baltimore County adopts NFPA 1 and NFPA 101 (2024) as its own fire code, matching the state edition.
  • Review time range (as of November 2026): BCFD states 10 to 25 business days for an initial review and 5 to 10 business days for a resubmission, and about 7 business days after the DHCD referral on an expedited third-party review. Baltimore County PAI publishes no plan review period.

What Baltimore City and Baltimore County Each Require

Baltimore City adopts its codes as one book, the Building, Fire, and Related Codes of Baltimore City (2024 Edition), enacted by Ordinance 24-341 and effective May 22, 2024. Part I takes in the Maryland Building Performance Standards (MBPS) with their 2021 IBC basis, and Part II carries the 2021 IBC with City modifications. Part VIII, Section 8-101, adopts the 2021 IFC, and Section 101.1 of that Part names it the Baltimore City Fire Code.

The City fire code keeps IFC Appendix B (fire flow) and does not adopt Appendix C (hydrant locations) or Appendix D (fire apparatus access roads), under Sections 101.2.1 and 101.2.2. Its Chapter 80 referenced standards are adopted as in the IFC. Section 105.1.1 requires permits under the code to come from the fire code official, as listed in the code or in the Fire Prevention Permit Schedule.

Baltimore County keeps its building and fire codes separate. PAI’s code list, revised October 4, 2026, shows the 2021 IBC and International Residential Code (IRC) adopted and amended by Bill 49-24, effective September 3, 2024. Bill 73-26, effective October 4, 2026, adopts NFPA 1 Fire Code and NFPA 101 Life Safety Code (2024) and other NFPA codes and standards as the Baltimore County Fire Prevention Code, which the Fire Marshal’s Office describes as closely paralleling the Maryland Fire Prevention Code.

How Baltimore Differs From the Maryland State Baseline

The state baseline has two parts. The MBPS, Code of Maryland Regulations (COMAR) 09.12.51, adopt the 2021 IBC, and a county or city may amend them locally (COMAR 09.12.51.05). The State Fire Prevention Code (SFPC), COMAR 29.06.01, adopts NFPA 1 and NFPA 101 (2024), effective June 23, 2025.

Baltimore City sits outside the second half. Under COMAR 29.06.01.03, the SFPC does not apply in Baltimore City except to buildings and conditions covered by Public Safety Article Title 6, Subtitle 4. That exclusion is why the City can run the IFC as its fire code while every Maryland county works from NFPA 1 and NFPA 101. DGA’s article on how Maryland’s building code and NFPA 1 and 101 divide the work covers the two-code arrangement that applies in the counties.

Baltimore County follows the state pattern and matches the state fire code edition. Under Public Safety Article 6-206, the SFPC is the minimum in every county, and a stricter local law controls where it is consistent with the SFPC. The table shows where each Baltimore jurisdiction departs from the model codes.

ItemModel code or state defaultBaltimore CityBaltimore County
Fire code basisSFPC: NFPA 1 and NFPA 101 (2024)2021 IFC as the Baltimore City Fire Code (Part VIII); SFPC only for Title 6, Subtitle 4 buildingsNFPA 1 and NFPA 101 (2024), Bill 73-26, alongside the SFPC
Third-party design evaluationNo FLSDE requirement in the model IBC or IFCFLSDE by a qualified third-party consultant for listed occupancies (Fire Code Sections 104.8.2.1 to 104.8.2.4)None published
Fire flow, hydrants, access roadsIFC Appendices B, C and D apply only where adoptedAppendix B adopted; Appendices C and D not adopted (Sections 101.2.1, 101.2.2)Not applicable; NFPA 1 governs
Building code2021 IBC through the MBPS2021 IBC with City modifications (Part II)2021 IBC as amended by Bill 49-24

The FLSDE is the City’s largest departure. Fire Code Section 104.8.2.4 requires one for new high-rise buildings and high-rise changes of use or Level III alterations, Group A buildings with an occupant load of 1,000 or more, Group H, Groups I-2 and I-3, all new Group R-1 and R-2 buildings, and any project the fire code official calls for. Under Section 104.8.2.2, the preparer holds either a fire protection engineering degree with a model code plan review certification and 2 years of experience, or the certification with 5 years.

Who Reviews Fire Protection Plans in Each Jurisdiction

In Baltimore City, DHCD runs the permit and the BCFD Office of the Fire Marshal, through its Plan Review Division, reviews the fire protection content. BCFD lists the work that needs its review: fire alarm and sprinkler installation or modification, new buildings, renovations and tenant fit-outs, changes of use, standpipes, fire pumps, kitchen hood suppression, smoke control, emergency generators, hazardous materials and emergency responder communication coverage.

BCFD also accepts third-party review for listed scopes. A BCFD-approved reviewer who is a Maryland registered fire protection engineer or a technician certified by the National Institute for Certification in Engineering Technologies (NICET) at Level IV may review additions or relocations of 20 or fewer fire alarm devices or 50 or fewer sprinkler heads on an existing approved system, new or modified kitchen suppression, and FLSDE projects. BCFD keeps final review and approval, and major changes during construction go back to both the reviewer and BCFD.

In Baltimore County, PAI’s Building Plans Review reviews new building plans and permits against the county building, fire and related codes. The Baltimore County Fire Marshal’s Office, part of the Baltimore County Fire Department, enforces the county fire code and inspects new and renovated buildings other than one- and two-family dwellings. Prince George’s County makes third-party review mandatory for fire protection shop drawings; DGA’s article on how Montgomery and Prince George’s Counties approve fire plans compares that model.

OSFM lists jurisdictional contacts for both Baltimore City and Baltimore County and states that it is responsible for all State-owned property, so a State-owned building in either jurisdiction also involves the State Fire Marshal. Where OSFM’s Engineering Services Section does review a project, its fees are set by COMAR 29.06.04.

Figure 1: Baltimore City vs Baltimore County

TopicBaltimore CityBaltimore County
Building code2021 IBC, Part II, Ordinance 24-3412021 IBC, Bill 49-24, effective September 3, 2024
Fire code2021 IFC as the Baltimore City Fire Code, Part VIIINFPA 1 and NFPA 101 (2024), Bill 73-26, effective October 4, 2026
Permit officeDHCDPAI
Fire protection reviewerBCFD Office of the Fire Marshal, Plan Review DivisionPAI plans review; Fire Marshal’s Office inspects
PortalDHCD ePlansPAI online permit portal
Sprinkler drawing preparerNot stated on BCFD’s plan review page; third-party reviewers must be Maryland registered fire protection engineers or NICET Level IVRegistered fire protection engineer or NICET Level III or higher, with hydraulic calculations
Third-party optionSmall changes to existing systems, kitchen suppression, FLSDENone published
Published review time10 to 25 business days initial; 5 to 10 resubmissionNone published
As of November 2026, Baltimore City reviews fire protection plans under the 2021 IFC through DHCD and BCFD with a published initial review of 10 to 25 business days, while Baltimore County reviews them under NFPA 1 and NFPA 101 (2024) through PAI and publishes no review period.

Opens the Project Desk with your sentence. Our licensed PEs review every brief and reply within one business day.

How to File Fire Protection Work in Baltimore City and Baltimore County

Baltimore City filings are electronic only, in DHCD’s ePlans system. The applicant registers, uploads complete construction documents, system drawings and specifications, pays the plan review fees, and tracks comments in the ePlans dashboard. After approval the applicant pays the permit fees and receives the stamped, approved set through ePlans.

An expedited third-party filing adds steps at the front. The applicant asks the BCFD Fire Prevention Office for authorization, engages an approved reviewer, and files with DHCD with “Expedited Third-Party Plan Review” stated in the permit description. A fire protection system filing carries the Third-Party Plan Review Certification Letter, the Fire Protection Submittal Form and the stamped system plans; an FLSDE filing carries the FLSDE report and stamped plans.

Figure 2: Baltimore City: From ePlans to Use and Occupancy

1. File in ePlansConstruction documents, system drawings and specifications uploaded to DHCD ePlans; plan review fees paid
2. BCFD reviewInitial review 10 to 25 business days; about 7 business days after the DHCD referral on an expedited third-party filing
3. ResubmissionCorrections reviewed in 5 to 10 business days; FLSDE resubmissions within 7 business days
4. PermitPermit fees paid; stamped, approved set issued through ePlans
5. BCFD inspectionsAll fire protection system inspections completed before the use and occupancy inspection
As of November 2026, BCFD states an initial fire protection plan review of 10 to 25 business days and a resubmission review of 5 to 10 business days in Baltimore City, and every BCFD fire protection system inspection must be complete before the use and occupancy inspection.

Baltimore County filings start in PAI’s online permit portal, where all construction permit applications are made. PAI requires a permit for every sprinkler system, filed as a Commercial or Residential Sprinklers Permit, and PAI’s Electrical Inspections alarm installations page states that any commercial fire alarm system needs a separate electrical permit. Sprinkler plans must be prepared under the supervision of a registered fire protection engineer or a NICET Level III or higher technician, include hydraulic calculations to NFPA 13, 13R or 13D, and follow PAI’s file naming rules.

A structural engineer’s certificate showing the added load of water-filled piping is required for sprinkler systems with pipe of 2½ in. or larger. Once fees are paid, PAI sends the application to every reviewing department for technical review and issues the permit when all reviews are approved. The approved plans carry the County Plans Review Office stamp and signature, and its comment letters form part of the approved set.

Figure 3: Baltimore County: From Portal Application to Use and Occupancy

1. Apply onlineCommercial or Residential Sprinklers Permit in PAI’s portal; plans, hydraulic calculations and file names per County rules
2. Structural certificateRequired where sprinkler pipe is 2½ in. or larger
3. Fees and technical reviewApplication fee calculated and paid, then sent to every reviewing department
4. Permit and stamped plansApplicant notified by e-mail when the permit issues; County Plans Review Office stamp and comment letters on site
5. Fire Marshal inspectionsRequested at least 3 working days ahead; fire code compliance before use and occupancy
Baltimore County requires a PAI permit for every sprinkler system, with plans prepared under a registered fire protection engineer or a NICET Level III or higher technician, and the Fire Marshal’s Office requires fire code compliance before a use and occupancy permit issues.

Review Times, Inspections and Enforcement in Each Jurisdiction

As of November 2026, BCFD’s plan review page states an initial review of 10 to 25 business days, varying with project size and scope, and 5 to 10 business days for resubmissions. Expedited review must be requested in advance and is subject to availability. On a third-party filing, BCFD states approval within about 7 business days of the DHCD referral, and an initial FLSDE review within about 15 business days.

Baltimore County PAI’s sprinkler permit and Building Plans Review pages state no review period. The BCFD figures cover plan review only, not a whole project; DGA’s fire protection project Timeline Estimator gives a schedule from design to closeout.

In Baltimore City, every BCFD inspection of a fire protection system must be complete before the use and occupancy inspection. Section 105.3.9 of the City fire code makes a breach of any permit condition a violation subject to the penalties in Section 110.

In Baltimore County, the Fire Marshal’s Office inspects and witnesses tests of sprinkler systems, underground fire service mains, fire suppression water tanks, kitchen hood suppression, fire pumps and standpipes. The permit holder requests inspections by phone at least 3 working days ahead, and use and occupancy inspections are scheduled automatically as part of the permit process. Approved plans and comment letters must be on site, and a deviation from the approved plans without a revised approval needs the Fire Marshal’s consent.

On the sprinkler standard, the two jurisdictions mostly agree. In Maryland, the county building permit reviews sprinklers to NFPA 13 (2019) through the 2021 IBC, while the State Fire Prevention Code (NFPA 1, 2024) references NFPA 13 (2022). Baltimore City reaches NFPA 13 (2019) through both the 2021 IBC and the 2021 IFC, and Baltimore County’s Bill 73-26 adopts NFPA 1 (2024) as well.

Key Takeaway: As of November 2026, Baltimore City runs fire protection approvals through DHCD’s ePlans and BCFD under its own fire code, the 2021 IFC, with a third-party FLSDE for high-rise, large assembly, high-hazard, institutional and new R-1 and R-2 projects and a published initial review of 10 to 25 business days. Baltimore County issues a sprinkler permit and a separate electrical permit for commercial fire alarm systems through PAI under the 2021 IBC and NFPA 1 and NFPA 101 (2024), and its Fire Marshal’s Office signs off fire code compliance before use and occupancy.

Frequently Asked Questions

Does Baltimore City use the IBC?

Yes. Part II of the Building, Fire, and Related Codes of Baltimore City (2024 Edition), enacted by Ordinance 24-341, adopts the 2021 IBC with City modifications. The City fire code is the 2021 IFC, not NFPA 1, because the State Fire Prevention Code does not apply in Baltimore City except to buildings covered by Public Safety Article Title 6, Subtitle 4.

Who is the fire code official in Baltimore County?

The Baltimore County Fire Marshal’s Office, within the Baltimore County Fire Department, enforces the Baltimore County Fire Prevention Code and inspects new and renovated buildings other than one- and two-family dwellings. Plan review sits with the Department of Permits, Approvals and Inspections, whose Building Plans Review checks new building plans and permits against the county building, fire and related codes.

Are sprinkler permits separate from the building permit?

Yes in Baltimore County, where PAI requires a permit for every sprinkler system, filed as its own Commercial or Residential Sprinklers Permit, and a separate electrical permit for a commercial fire alarm system. In Baltimore City, sprinkler and fire alarm work is filed with DHCD through ePlans and reviewed by the BCFD Office of the Fire Marshal before the permit issues.

Which NFPA 13 edition applies?

NFPA 13 (2019) through the 2021 IBC in both jurisdictions. Baltimore City also reaches the 2019 edition through the 2021 IFC, while in Baltimore County the State Fire Prevention Code and the county’s NFPA 1 (2024) reference NFPA 13 (2022).

This article is general information, not a code determination for any project. Code editions, local ordinances and reviewer practice change; confirm the adopted code, the reviewing office and the permit path for the project with Baltimore City or Baltimore County.

Filing Fire Protection Work in Baltimore City or County?

Send the jurisdiction, the use group, the construction type and the scope of the fire protection work. DGA confirms the code edition and permit path, prepares the code analysis and drawings, and answers comments from BCFD or the County plans reviewers. Project briefs get confirmation and preliminary code feedback within one business day.

Send a Project Brief → View Code Consulting Services

Leave a Reply

Your email address will not be published. Required fields are marked *

Quick inquiry

Ready when you are.

Your name, a way to reach you, and where the project is. One of our licensed PEs replies within one business day. No sales calls.

Prefer to describe it first? Open the Project Desk