Storage and Commodities · Trigger
When Does a Warehouse Need Draft Curtains?
Reviewed by a licensed Professional Engineer · NY, NJ, PA, MD, DE · Last reviewed · Code basis: NFPA 13 (2016 as modified by NYC Appendix Q, 2019, 2022, 2025); NFPA 204 (2021); IFC and IBC Section 910 (2018, 2021, 2024); IFC Table 3206.2 (2018, 2021, 2024); NFPA 1 (2024)
General guidance, not a code determination for any project. Confirm the adopted code and local amendments with the authority having jurisdiction.
A warehouse needs a draft curtain today mainly where National Fire Protection Association (NFPA) 13 calls for one: on the line where an early suppression fast-response (ESFR) sprinkler area meets an area protected by standard-response sprinklers. NFPA 13 (2022) Section 14.2.5 requires a noncombustible curtain at least 2 ft deep on that boundary, centered over a clear aisle at least 4 ft wide. The International Fire Code (IFC) and International Building Code (IBC) stopped requiring draft curtains with smoke and heat vents in their 2015 editions, so a vent or exhaust requirement no longer brings a curtain with it.
Draft curtains, also called curtain boards, still appear in three other places: as one way to separate two different sprinkler designs under NFPA 13, in a vent design engineered under NFPA 204, and around unenclosed floor openings protected by closely spaced sprinklers. Inside an ESFR area a curtain works against the sprinklers, which is why the model codes moved away from them.
At a Glance: Draft Curtains in Warehouses
- Threshold(s): an ESFR area that shares an open ceiling with standard-response sprinklers (curtain at least 2 ft deep over a clear aisle at least 4 ft wide); two different sprinkler designs that meet with no wall between them (curtain or barrier over an aisle, or the more demanding design extended 15 ft); an NFPA 204 vent design that relies on curtained areas.
- Code, edition, section: NFPA 13 (2022) Sections 14.2.5 and 19.1.2, with Section 14.2.5 also in the 2019 edition and Section 14.2.4 in the 2025 edition; NFPA 204 (2021) Chapter 7. The 2018, 2021 and 2024 IFC and IBC Section 910 and IFC Table 3206.2 carry no draft curtain requirement.
- Main exceptions: one sprinkler type and design across the whole ceiling; a full-height wall on the boundary in place of the curtain; for designs other than the ESFR boundary, extending the more demanding design 15 ft.
- What applies once triggered: noncombustible construction, depth measured down from the underside of the roof deck or ceiling, a permanent clear aisle under the curtain, and the curtain shown on the sprinkler shop drawings and the high-piled storage plan.
- Permit or filing: part of the sprinkler permit and shop drawing submittal, and shown again on the high-piled storage plan where IFC Chapter 32 or NFPA 1 Chapter 34 applies.
- Who decides: the fire protection engineer of record proposes the separation; the authority having jurisdiction (AHJ), meaning the building official, fire protection subcode official or fire marshal, approves it; the insurer may ask for more.
Where Do the Codes Still Require a Draft Curtain?
The table lists each warehouse situation where a current code or standard requires a draft curtain or offers one as an option. The jurisdiction table further down gives the NFPA 13 edition for each state.
| Situation | Draft curtain rule | Numbers | Code and section |
|---|---|---|---|
| ESFR area next to standard-response sprinklers (control mode density/area, or standard-response control mode specific application (CMSA) sprinklers) | Required on the boundary | Noncombustible; at least 2 ft deep; clear aisle at least 4 ft wide centered below | NFPA 13 (2022) Section 14.2.5; same section in NFPA 13 (2019) |
| Two different hazards or design methods meet with no wall, such as Class IV rack storage beside an ordinary hazard packing area | Option, in place of extending the design | More demanding design extends 15 ft beyond its edge unless a draft curtain or barrier above an aisle separates the areas | NFPA 13 (2022) Section 19.1.2 |
| Unenclosed floor opening protected by closely spaced sprinklers, where the building code allows that in place of an enclosure | Required around the opening | At least 18 in. deep; sprinklers no more than 6 ft apart and 6 to 12 in. from the curtain on the side away from the opening | NFPA 13 (2022) Section 9.3.5 |
| Smoke and heat venting engineered to NFPA 204 that relies on curtained areas | Required where the vent design uses them | Depth at least 20 percent of the ceiling height; each curtained area no longer or wider than 8 times the ceiling height | NFPA 204 (2021) Chapter 7 |
| Smoke and heat vents or mechanical exhaust required by the IFC or IBC | Not required | No curtain depth or curtained area limits | 2018, 2021 and 2024 IFC and IBC Section 910; IFC Table 3206.2 |
| Building approved under the 2012 or an earlier IFC or IBC | Required at approval where vents were required; often still in place | Group F-1 and S-1: at least 0.2 times the ceiling height and never less than 4 ft, enclosing no more than 50,000 sq ft | 2012 and earlier IFC and IBC Section 910 and Table 910.3 |
The first row drives most warehouse draft curtains built now. ESFR protection is common in new distribution buildings, and the office, packing, battery charging or cold storage area beside it is often protected by standard-response sprinklers, so the boundary between the two needs a curtain unless a wall already sits on that line.
Mixing quick-response and standard-response control mode sprinklers under one open roof is a separate question. NFPA 13 (2022) Chapter 9 expects sprinklers within a compartment to share one response type once quick-response sprinklers are used there, and a draft curtain is not a wall, so the usual answers are one response type or a wall on the boundary.
Figure 1: The ESFR Boundary Curtain
Why Did the IFC and IBC Stop Requiring Draft Curtains?
Through the 2012 editions, IFC and IBC Section 910 required draft curtains together with smoke and heat vents in large Group F-1 and S-1 buildings and in high-piled storage, with Table 910.3 setting the curtain depth and the area each curtained section could hold. For Group F-1 and S-1 the table called for a curtain at least 0.2 times the ceiling height and never less than 4 ft, enclosing no more than 50,000 sq ft, and the 2012 IFC high-piled storage table (Table 3206.2) carried its own curtain board column. Even then the codes kept curtains out of ESFR areas and placed them only on the line between ESFR and other sprinklers.
Tests by Factory Mutual in 1994 and a 1997 to 1998 study sponsored by the Fire Protection Research Foundation found that draft curtains in sprinklered storage can increase the number of sprinklers that open. The 2015 IFC and IBC then rewrote Section 910 as smoke and heat removal, sized vents from the building volume or floor area, added a mechanical exhaust option and dropped draft curtains.
The 2018, 2021 and 2024 editions kept that approach, with no draft curtain provision in Section 910 and no curtain column or footnote in IFC Table 3206.2. The area bands and the vent or exhaust design for high-piled storage are covered in DGA’s article on when high-piled storage needs smoke and heat removal.
How Is a Draft Curtain Measured and Located?
Draft curtain depth is measured downward from the underside of the roof deck or ceiling to the bottom edge of the curtain, not from the sprinkler deflectors. At an ESFR boundary the minimum is 2 ft under NFPA 13 (2022) Section 14.2.5. Around a floor opening it is 18 in. under Section 9.3.5, and in an NFPA 204 vent design it scales with the ceiling height.
Draft curtain location follows the curtain’s purpose. At the ESFR boundary the curtain sits on the line between the two sprinkler systems, over the center of a clear aisle at least 4 ft wide, so heat from a fire on one side is less likely to open the other system’s sprinklers. Racks, pallets or staged goods in that aisle defeat the separation, so the aisle belongs on the high-piled storage plan and in the floor striping.
The area a draft curtain encloses matters only in a vent design. NFPA 13 sets no area limit on either side of an ESFR boundary curtain, because that curtain keeps heat from fusing the wrong sprinklers rather than holding smoke for vents. NFPA 204 (2021) Chapter 7 does: each curtained area can be no longer or wider than 8 times the ceiling height, with the curtain at least 20 percent of the ceiling height deep.
For a warehouse with a 40 ft ceiling, those NFPA 204 proportions give a curtain at least 8 ft deep and curtained areas no more than 320 ft on a side, or 102,400 sq ft, while the same building’s ESFR boundary curtain needs only 2 ft. A vent design that depends on deep curtains therefore has to be squared with the sprinkler design before either is drawn.
Draft curtain construction is noncombustible at the ESFR boundary, typically sheet metal or gypsum board on a steel frame, and in practice the joints and top edge are closed to the deck so heat cannot pass over the curtain. Around floor openings NFPA 13 also allows limited-combustible material that stays in place during sprinkler operation.
Sprinklers next to a draft curtain follow the rules for their own type. At a floor opening, NFPA 13 (2022) Section 9.3.5 places the closely spaced sprinklers no more than 6 ft apart and 6 to 12 in. from the curtain on the side away from the opening. At an ESFR boundary, the ESFR obstruction rules in NFPA 13 (2022) Chapter 14 treat the curtain like any other element hanging below the deck.
Where Do Draft Curtains Hurt Sprinkler Performance?
Inside a sprinklered storage area, a draft curtain changes where the heat goes, and storage sprinkler criteria assume it does not. The NFPA 13 storage annex (A.12.1.1 in the 2010 edition) notes that the standard’s storage criteria come from fire tests run without roof vents or draft curtains, and NFPA 13 (2022) Section 20.9.5.3 limits automatic roof vents in ESFR buildings to vents with high-temperature, standard-response operating elements.
Three failure patterns show up in testing and in fire losses. A fire that starts under or next to a curtain splits its heat between two sides, so sprinklers open on both sides and the count can exceed the design area. A curtain hung over racks instead of an aisle blocks part of the spray from the sprinklers beside it, and heat held on one side can travel along the curtain and open sprinklers away from the fire, using water the sprinklers over the fire need.
ESFR is the most sensitive case. An ESFR system is designed to suppress the fire with the 12 sprinklers in its design area (NFPA 13 (2022) Chapter 23), and anything that delays the first sprinklers or spreads operation beyond those 12 erodes that margin. DGA’s comparison of ESFR and CMSA sprinklers for warehouses treats a clean ceiling as an ESFR condition for the same reason.
DGA designs warehouse sprinkler systems and sets sprinkler boundaries, draft curtains included, across New York, New Jersey, Pennsylvania, Maryland and Delaware. Project briefs get confirmation and preliminary code feedback within one business day. See where DGA works →
What Do FM Global Data Sheets Expect?
FM Global’s guidance, paraphrased, agrees with NFPA 13 on the basic point and is more specific about where curtains belong. FM Global Data Sheet 2-0 on sprinkler installation and Data Sheet 1-10 on the interaction of sprinklers, smoke and heat vents and draft curtains generally advise against draft curtains in sprinklered buildings. The exception is a curtain that separates areas protected by different kinds of ceiling-level storage sprinklers, such as quick-response from standard-response.
The FM Global data sheets set their own curtain depth and aisle criteria, which are paraphrased here and not reproduced. An FM Global insured warehouse is designed to whichever criterion is stricter at each boundary, and checking the data sheet before the curtain is detailed avoids a recommendation after the first insurer visit.
What Exceptions and Alternatives Avoid a Draft Curtain?
Four design choices remove the need for a draft curtain or replace it with something stronger. Each is easiest before the sprinkler layout and the racks are fixed.
One sprinkler type across the ceiling. Extending ESFR protection over the adjacent area, where the ceiling height, obstructions and water supply allow it, removes the boundary that Section 14.2.5 regulates. The reverse also works: protecting the whole building with control mode sprinklers, with in-rack sprinklers where the storage needs them, avoids an ESFR edge; DGA’s article on choosing between ESFR and in-rack sprinklers covers that trade.
A wall instead of a curtain. A full-height wall, fire barrier or fire wall on the boundary line separates the two sprinkler systems more completely than a curtain and also satisfies the adjacent-design rule in NFPA 13 (2022) Section 19.1.2. Walls that already exist, such as the line between the warehouse and the office, are the cheapest place to put a sprinkler boundary.
Extending the more demanding design 15 ft. Where the only rule in play is Section 19.1.2, because two control mode designs meet, the more demanding design can run 15 ft past its edge instead of a curtain. That option does not replace the curtain at an ESFR boundary with standard-response sprinklers, where Section 14.2.5 applies on its own terms.
Vent or exhaust choices that need no curtain. Mechanical exhaust or vents sized to IFC Section 910 need no curtains, and an NFPA 204 design can often be laid out without them. Those choices belong to the vent design covered in the smoke and heat removal article.
Figure 2: Does This Warehouse Need a Draft Curtain?
What Applies Once a Draft Curtain Is Required?
A required draft curtain becomes part of the sprinkler design and has to appear in three places. The sprinkler shop drawings show the curtain line, its depth, its material and the clear aisle below it, and the hydraulic calculations treat each side under its own design criteria. Where IFC Chapter 32 or NFPA 1 Chapter 34 applies, the high-piled storage plan shows the aisle as a no-storage zone; DGA’s article on when IFC Chapter 32 applies to high-piled storage explains when that plan is required.
A draft curtain also has to survive the life of the building. Roof work, a new conveyor or a re-rack can cut or move the curtain, and pallets stored in the aisle remove the separation without touching it. Each of those changes reopens the sprinkler design and goes back to the engineer of record before work starts.
How Do New York, New Jersey, Pennsylvania, Maryland and Delaware Apply Draft Curtain Rules?
The draft curtain rule travels with the NFPA 13 edition each jurisdiction references, and the IBC and IFC editions in force outside New York City (NYC) carry no curtain requirement in Section 910. The table lists the editions and reviewers as of October 2026.
| Jurisdiction | Building and fire code in force | Where the curtain rule sits | AHJ and filing |
|---|---|---|---|
| New York State (outside New York City) | 2025 Uniform Code on the 2024 IBC and IFC | NFPA 13 (2022) Sections 14.2.5 and 19.1.2; no curtain requirement in 2024 IBC or IFC Section 910 | Local code enforcement official; sprinkler drawings with the building permit |
| New York City | 2022 NYC Building Code and 2022 NYC Fire Code | NFPA 13 (2016) as modified by Appendix Q of the 2022 NYC Building Code, ESFR boundary and adjacent design rules; NYC Building Code Chapter 9 for smoke and heat removal | Department of Buildings (DOB) sprinkler filing in DOB NOW; Fire Department of the City of New York (FDNY) for high-piled storage under the Fire Code |
| New Jersey | Uniform Construction Code (UCC) on the 2024 I-Codes since August 17, 2026; Uniform Fire Code on a 2018 IFC basis | NFPA 13 (2022) Sections 14.2.5 and 19.1.2; no curtain requirement in 2024 IBC or 2018 IFC Section 910 | Fire protection subcode official at the construction permit; local fire official for existing buildings |
| Pennsylvania | UCC on the 2021 I-Codes since January 1, 2026; no statewide fire code | NFPA 13 (2019) Sections 14.2.5 and 19.1.2; no curtain requirement in 2021 IBC Section 910 | Municipal or third-party code official; Department of Labor and Industry (L&I) where it has jurisdiction |
| Maryland | 2021 IBC through the county building codes; State Fire Prevention Code on NFPA 1 and NFPA 101 (2024) | NFPA 13 (2019) through the 2021 IBC; NFPA 1 (2024) references NFPA 13 (2022); the ESFR boundary rule is Section 14.2.5 in both | County building official; State Fire Marshal or local fire marshal |
| Delaware | Regulation 701 (2026) with NFPA 1 and NFPA 101 (2024); IBC by county (New Castle and Sussex 2021, Kent and Wilmington 2018) | NFPA 13 (2025) Section 14.2.4 for the ESFR boundary, and the adjacent design rules; no curtain requirement in 2018 or 2021 IBC Section 910 | Office of the State Fire Marshal plan review (Wilmington Fire Marshal inside the city); county building permit |
Editions as listed in DGA’s Fire Code Cheat Sheet for NY, NJ, PA, MD and DE. Local amendments are not shown.
Key Takeaway: A warehouse needs a draft curtain mainly where ESFR sprinklers meet standard-response sprinklers under one open roof: noncombustible, at least 2 ft deep and centered over a clear aisle at least 4 ft wide under NFPA 13 (2022) Section 14.2.5. The IFC and IBC dropped curtains from Section 910 in 2015, NFPA 204 uses them only in engineered vent designs, and inside an ESFR area a curtain works against the sprinklers.
Frequently Asked Questions
Did the IFC stop requiring draft curtains?
Yes. The 2015 IFC and IBC rewrote Section 910 as smoke and heat removal and dropped the draft curtain requirement, and the 2018, 2021 and 2024 editions and IFC Table 3206.2 carry none. A curtain now comes with vents only where an engineered NFPA 204 vent design relies on curtained areas.
Does an ESFR warehouse need a draft curtain?
Conditional: only on the edge where the ESFR area meets standard-response sprinklers. NFPA 13 (2022) Section 14.2.5 requires a noncombustible curtain at least 2 ft deep there, over a clear aisle at least 4 ft wide. Inside the ESFR area a curtain works against the sprinklers.
How deep does a draft curtain have to be?
At least 2 ft at an ESFR boundary under NFPA 13 (2022) Section 14.2.5, 18 in. around a floor opening under Section 9.3.5, and at least 20 percent of the ceiling height in an NFPA 204 vent design. Depth is measured down from the underside of the roof deck or ceiling.
Can a wall replace a draft curtain?
Yes. A full-height wall, fire barrier or fire wall on the boundary separates the sprinkler systems more completely than a curtain and also satisfies the NFPA 13 (2022) adjacent-design rule in Section 19.1.2. Existing walls, such as the line between warehouse and office, are the usual place for a sprinkler boundary.
Can storage sit under a draft curtain?
No, not at an ESFR boundary. NFPA 13 (2022) Section 14.2.5 requires a clear aisle at least 4 ft wide centered under the curtain, and racks or pallets placed in that aisle defeat the separation.
More in Storage and Commodities
- When Does IFC Chapter 32 Apply to High-Piled Storage?
- Why Do Freezer Sprinkler Pipes Get Ice Plugs?
- What Fire Protection Does a Warehouse Need?
- What Fire Protection Do Cold Storage and Food Plants Need?
- What Rules Apply to Carpet, Mattress and Furniture Storage?
- What Fire Protection Does a Retail Store Need?
This article is general information, not a substitute for a project-specific code analysis. Code editions, local amendments, insurer requirements and reviewer practice change; confirm the adopted code and the authority having jurisdiction for the project.
Planning an ESFR Boundary?
Send the floor plan, the roof height, the sprinkler design basis for each area and the insurer, if one is involved. DGA confirms where a draft curtain is required, how deep it has to be and whether a wall or a single sprinkler type would avoid it. Project briefs get confirmation and preliminary code feedback within one business day.