Yes. Storing lithium-ion batteries in a warehouse changes the sprinkler design in almost every case, because NFPA 13, the National Fire Protection Association (NFPA) Standard for the Installation of Sprinkler Systems, has no prescriptive protection scheme for them. The 2022 edition’s annex commodity table (Table A.20.4(a)) lists lithium-ion batteries as outside the standard’s protection scope, so a ceiling-only design picked from the storage tables cannot be shown to cover them. The design instead comes from an alternative, engineered approach under NFPA 13 Chapter 24, or from insurer guidance such as FM Global Data Sheet 7-112 (Lithium-Ion Battery Manufacturing and Storage), accepted by the authority having jurisdiction (AHJ).
How far the design has to move depends on 6 factors: the quantity stored, the state of charge, the packaging, the storage height, the share of the array the batteries occupy, and what the existing sprinkler system was designed for. This article is the storage angle on that question for a warehouse or distribution center in New York, New Jersey, Pennsylvania, Maryland or Delaware. The permit and code-trigger side, including the 2024 International Fire Code (IFC) Section 320 rules, comes in here only as far as it shapes the sprinkler design. Energy storage systems that are installed and operating fall under NFPA 855 and are a different subject, not covered here.
At a Glance: Lithium-Ion Storage and Sprinkler Design
- Threshold(s) with units: any lithium-ion battery storage that is not covered by the parent commodity changes the design; the 2024 IFC Section 320 permit and protection provisions start at more than 15 cubic feet of batteries in a fire area; FM Global Data Sheet 7-112 shifts from a ceiling-only scheme to in-rack protection above about 15 ft of storage, above about 60 percent state of charge, or above a 40 ft ceiling (paraphrased).
- Code, edition, section: NFPA 13 (2022; 2016 as modified in New York City; 2019 in Pennsylvania and Maryland; 2025 in Delaware) Chapter 20 for commodity classification and Chapter 24 for alternative storage designs; 2024 IFC Section 320 where adopted (New York State); 2021 IFC Chapter 32 high-piled storage with lithium-ion batteries listed as a high-hazard commodity in Table 3203.8; International Building Code (IBC) Section 104.11 and IFC Section 104.10 in the 2021 editions, or Section 104.2.3 in the 2024 editions, for alternative materials and methods.
- Main exceptions: quantities under the 15 cubic foot threshold; batteries installed in the products they power, which some AHJs treat as the parent commodity; storage held at or below 30 percent state of charge, which the 2024 IFC uses to waive some requirements and FM Global treats as a lower hazard; detached or outdoor storage.
- What applies once triggered: an engineered sprinkler design (FM Global Data Sheet 7-112 scheme or a test-based design), a technical opinion and report, an updated high-piled storage plan, often a larger water supply, the AHJ’s acceptance and the insurer’s sign-off.
- Permit or filing: a high-piled combustible storage permit or an amended one; in New York State an operational permit under 2024 IFC Section 320.2; a sprinkler alteration permit where heads, barriers or the water supply change.
- Who decides: the fire code official or fire marshal accepts the design basis; the fire protection engineer prepares and seals it; the property insurer sets its own, usually stricter, expectation.
Why NFPA 13 Has No Table for Lithium-Ion Batteries
NFPA 13 protects storage by classifying the commodity, then reading a ceiling design or an in-rack arrangement from the tables for that class, storage height and ceiling height. The classification chapter (Chapter 20 in the 2019, 2022 and 2025 editions) sorts goods into Class I through Class IV and Group A plastics, with cartoned and exposed, expanded and unexpanded subdivisions. Lithium-ion batteries have no class. The 2022 annex commodity table (Table A.20.4(a)) lists them as outside the scope of NFPA 13 protection criteria. DGA’s article on how commodity classification works under NFPA 13 explains the class system the batteries fall outside of.
The reason is the fire behavior. A cell in thermal runaway releases its own flammable electrolyte vapor and heat, so the fire does not depend on the oxygen and fuel geometry that the commodity tables were built on. Large-scale tests run by FM Global and the Fire Protection Research Foundation on cartoned lithium-ion cells in rack storage between 2013 and 2016 (Fire Protection Research Foundation, Lithium-Ion Batteries Hazard and Use Assessment, Phases II and III) showed that a standard ceiling-only design could control fires in some arrangements, mainly small cells in cartons at limited heights and low state of charge, and could not be relied on for bulk storage without more sprinklers, barriers or in-rack protection.
That leaves two routes in the standard itself. NFPA 13 Chapter 24, Alternative Sprinkler System Designs for Storage Applications, allows designs based on full-scale fire tests or on listings for a specific commodity and arrangement. The other route is the code’s alternative materials and methods clause, IBC Section 104.11 and IFC Section 104.10 in the 2021 editions or Section 104.2.3 in the 2024 editions, under which the fire code official can accept an engineered design, most often one that follows FM Global Data Sheet 7-112.
What Thresholds Change the Sprinkler Design?
No single number turns the design on or off. The table lists the 6 factors a fire protection engineer measures, the thresholds that appear in the 2024 IFC and in FM Global guidance, and where each one comes from. The FM Global values are paraphrased from the current data sheet and are checked against it on every project.
| Factor | Threshold or break point | Source | Effect on the design |
|---|---|---|---|
| Quantity in the fire area | More than 15 cubic feet of lithium-ion or lithium metal batteries | 2024 IFC Section 320.2 and 320.4 | Below the threshold the batteries are a small part of the mixed commodity; above it the fire code official can require sprinklers designed to an accepted basis, a technical opinion and report, separation and detection. |
| State of charge (SOC) | About 30 percent or less; FM Global uses a higher break point near 60 percent | 2024 IFC Section 320.4 exceptions; FM Global Data Sheet 7-112, paraphrased | Lower charge means less stored energy and a slower, less violent runaway. The IFC waives the technical report, 2-hour separation and explosion control at 30 percent or below; FM Global permits a ceiling-only scheme below its break point. |
| Packaging | Cells vs packs vs products with batteries installed; cartoned vs exposed; expanded plastic vs cellulosic cushioning | FM Global Data Sheet 7-112, paraphrased; NFPA 13 Chapter 20 for the packaging materials themselves | Cartoned cells with paper or molded pulp cushioning get the least demanding scheme; expanded plastic cushioning or plastic outer packaging pushes the design to the expanded or unexpanded plastic criteria. |
| Storage height and ceiling height | Ceiling-only schemes limited to about 15 ft of storage and 3 tiers under a ceiling of about 40 ft | FM Global Data Sheet 7-112, paraphrased | Above those limits the guidance calls for in-rack sprinklers with horizontal barriers, and nothing stored above the batteries in open racks. |
| Share of the array | Batteries as a minority of a mixed commodity vs a dedicated battery area | NFPA 13 Chapter 20 mixed commodity rules; AHJ practice | Small, dispersed quantities are often treated as the parent commodity; a dedicated battery aisle or room is designed as its own hazard. |
| Existing sprinkler design | Design density and area, or early suppression fast response (ESFR) K-factor and pressure, against the scheme required | Hydraulic calculations on file; the NFPA 13 hydraulic design information sign (Section 29.4 in 2022, 28.5 in 2019) | A warehouse already built to a Group A plastics or ESFR design may need only barriers and in-rack heads; a Class I to IV design usually needs a new ceiling design and more water. |
Figure 1: Six Factors, From Low Hazard to High
How Is the Lithium-Ion Hazard Measured?
The measurement starts with an inventory, not a sprinkler calculation. The fire protection engineer lists every lithium-ion item by chemistry (lithium iron phosphate, nickel manganese cobalt and the others behave differently), by watt-hour capacity per cell or pack, by state of charge as received and as stored, by packaging at each level, and by where and how high the items sit in the array. The inventory also records whether the batteries arrive installed in a product, such as a power tool or an e-bike, or as loose cells and packs for assembly.
The engineer then applies a commodity approach. FM Global Data Sheet 7-112 treats lithium-ion cells, modules and products as a hazard in their own right, and sorts them by state of charge, packaging and arrangement into scenarios that each point to a protection scheme, from a quick-response ceiling-only design through the expanded plastic criteria to in-rack sprinklers with barriers (paraphrased). The 2024 IFC adds the quantity test: the cubic feet of batteries in the fire area, net of the products they are installed in. For a mixed commodity, NFPA 13 Chapter 20 governs how a minority of higher-hazard goods is treated, and the engineer documents the percentage and the dispersion.
Someone has to sign the classification. In every state DGA works in, the high-piled storage plan and the sprinkler design basis are sealed by a licensed Professional Engineer (PE) or, for the sprinkler layout, prepared by a contractor under NFPA 13 Chapter 28 (Chapter 27 in 2019) and reviewed by the engineer of record. The AHJ accepts the classification; the insurer’s field engineer usually reviews the same inventory against the data sheet. Getting the two to agree on the inventory before the design starts avoids a redesign later.
Where Does 2024 IFC Section 320 Apply in the Region?
Section 320 is new in the 2024 IFC, so it applies only where the 2024 edition has been adopted. In the DGA states that means New York State outside New York City. Everywhere else the AHJ decides under the general alternative methods clause and the high-piled storage chapter. The table shows the position in each jurisdiction as of October 2026.
| Jurisdiction | Fire code and edition | Does Section 320 apply? | Who reviews | What they expect |
|---|---|---|---|---|
| New York State (outside NYC) | 2025 Uniform Code, Fire Code of New York State on the 2024 IFC; NFPA 13 (2022) | Yes, as adopted in the 2025 Uniform Code | Local code enforcement official; county fire coordinator on some projects | Operational permit above 15 cubic feet, a technical opinion and report under Section 104.2.2, a sprinkler design the official has accepted, and an amended high-piled storage permit |
| New York City | 2022 NYC Fire Code; 2022 Building Code; NFPA 13 (2016) as modified by Appendix Q | No. The 2022 Fire Code predates Section 320; FDNY regulates lithium-ion batteries through Fire Code Chapter 3 and its own rules in Title 3 of the Rules of the City of New York (3 RCNY) | Fire Department of New York (FDNY) Bureau of Fire Prevention; Department of Buildings (DOB) for the sprinkler work permit | An FDNY technical report or variance request for the storage, a sprinkler filing with DOB under the Building Code, and an FDNY permit for the storage occupancy where required |
| New Jersey | Uniform Fire Code on the 2018 IFC with New Jersey amendments; Uniform Construction Code on the 2024 I-Codes (NFPA 13 2022) for construction | No. The Uniform Fire Code has no Section 320; the construction side under the 2024 International Building Code applies to new work but the storage rules come from the fire code | Local fire official (Uniform Fire Code); municipal fire protection subcode official (construction permit) | No separate fire permit for high-piled storage (the fire official enforces IFC Chapter 32 at inspection); the commodity classification, a design basis under the 2018 IFC Section 104.9 alternative methods clause, and the fire protection subcode review of any sprinkler change |
| Pennsylvania | Uniform Construction Code on the 2021 I-Codes (2021 IFC where a municipality adopts it); NFPA 13 (2019) | No. 2021 IFC Chapter 32 applies to high-piled storage and lists lithium-ion batteries as a high-hazard commodity in Table 3203.8; no Section 320 | Municipal or third-party code official; Philadelphia Department of Licenses and Inspections (L&I) in the city | A high-piled storage plan treating the batteries as high-hazard, and acceptance of the engineered design under 2021 IFC Section 104.10 |
| Maryland | State Fire Prevention Code, NFPA 1 (2024); 2021 IBC; NFPA 13 (2019) | No. NFPA 1 (2024) has no dedicated lithium-ion storage section comparable to IFC 320; its high-piled storage chapter (Chapter 34) refers the design to NFPA 13 | State or county fire marshal; county building official | A sealed design under NFPA 13 Chapter 24 or an equivalency request under NFPA 1 Section 1.4, with the fire test or data sheet basis attached |
| Delaware | State Fire Prevention Regulations, 2026 edition, NFPA 1 (2024); NFPA 13 (2025); IBC by county | No, same position as Maryland | Office of the State Fire Marshal; Wilmington Fire Marshal inside the city | Plan review of the storage and sprinkler design before the building permit, with the engineered design basis and water supply analysis |
Editions as listed in DGA’s Fire Code Cheat Sheet for NY, NJ, PA, MD and DE. Local amendments are not shown.
DGA classifies commodities, prepares high-piled storage plans and designs storage sprinkler systems across New York, New Jersey, Pennsylvania, Maryland and Delaware. Project briefs get confirmation and preliminary code feedback within one business day. See where DGA works →
Exceptions and Alternatives to a Full Redesign
Several conditions keep a lithium-ion storage project inside the existing sprinkler design, or limit how far the design has to move. None of them is automatic; each one has to be documented in the high-piled storage plan and accepted by the AHJ.
- Small quantities. Below the 15 cubic foot threshold in a fire area, the 2024 IFC Section 320 provisions do not apply, and most AHJs on older codes accept that a few pallets dispersed in a mixed commodity do not change the design. The quantity still has to be counted and stated on the plan.
- Batteries installed in products. The 2024 IFC excludes new or refurbished batteries installed in the equipment they power, and batteries packed with that equipment, from Section 320. Some AHJs extend that logic and treat power tools, consumer electronics and small appliances as their parent commodity, often cartoned unexpanded Group A plastics. E-bikes and larger packs are less often accepted that way, and the position varies by reviewer.
- Segregated low-SOC storage. A dedicated area holding cells at or below 30 percent state of charge is the easiest case to protect. The 2024 IFC waives the technical report, 2-hour separation and explosion control at that level, and FM Global’s least demanding scheme applies below its break point. The operator has to be able to show the state of charge, so this works for distribution of new product, not for returns.
- In-rack sprinklers and vertical or horizontal barriers. Where a ceiling design cannot be shown to work, in-rack sprinklers with horizontal barriers at set intervals usually can, and they keep the fire in the rack where it started. DGA’s article on when in-rack sprinklers are required covers the arrangements.
- Detection and early response. Aspirating smoke detection or thermal imaging that catches off-gassing before ignition is part of the 2024 IFC Section 320.4 indoor requirements and is often what an insurer asks for first. Detection supplements the sprinklers; it does not replace them.
- Outdoor or detached storage. Moving the batteries to a detached structure or a protected outdoor area takes the hazard out of the main warehouse. The 2024 IFC Section 320.4.3 sets separation distances and pile limits for outdoor storage, and the main building’s design then stands as it is.
What Applies Once the Design Changes?
Once the inventory shows lithium-ion storage the existing design does not cover, the project becomes an engineered sprinkler design rather than a table lookup. The engineer selects the basis, either an FM Global Data Sheet 7-112 scheme matched to the scenario or a design supported by full-scale fire tests for the same cell size, packaging and arrangement, and documents it under NFPA 13 Chapter 24. The ceiling-only schemes in the data sheet call for large-orifice quick-response sprinklers at a set pressure over a 12-sprinkler design area, and the in-rack schemes call for specific K-factors, barrier spacing and a minimum number of operating heads (paraphrased).
The paperwork follows the design. A technical opinion and report, prepared by a qualified engineer and submitted under IFC Section 104.8.2 (2021) or 104.2.2 (2024), explains the hazard and the basis to the fire code official. The high-piled storage plan is updated with the battery area, the commodity classification and the new design criteria, and the plan’s companion article on how storage height drives the ceiling sprinkler design shows how the height limits in the scheme translate to the racks. Where heads, barriers or pipe sizes change, a sprinkler alteration permit is filed with the building department.
Water supply is the cost item owners miss. A 12-sprinkler design of K-25.2 heads at 35 psi flows well over 1,500 gpm before hose allowance, and in-rack sprinklers add to that demand, so a warehouse designed for a Class III commodity at 0.2 gpm per sq ft often finds its fire pump or city main short. A current hydrant flow test and a water supply analysis belong at the start of the project, not after the sprinkler layout is drawn. DGA’s industrial and high-hazard sector page describes how these projects are staffed.
Figure 2: From Inventory to Design Basis
Code Minimum vs What Insurers Expect
The fire code sets a floor, and for lithium-ion storage that floor is thin: outside New York State, the adopted codes in the region have no battery-specific sprinkler requirement at all, and even Section 320 defers the design to what the fire code official accepts. Property insurers do not leave the question open. FM Global Data Sheet 7-112, Lithium-Ion Battery Manufacturing and Storage, issued in October 2024 and carrying forward the storage criteria that were in Data Sheet 8-1, gives its field engineers a scheme for each storage scenario and a list of conditions that move the account to in-rack protection, and other carriers borrow it. An insured warehouse will usually be held to the data sheet whatever the AHJ accepts.
Figure 3: Two Standards for the Same Racks
- NFPA 13: no listed class; design under Chapter 24 or the alternative methods clause
- 2024 IFC Section 320: sprinklers to an accepted basis above 15 cubic feet, technical report, separation; New York State only
- 2018 and 2021 IFC states: high-piled storage permit, high-hazard commodity treatment, AHJ judgment
- Acceptance varies by reviewer and is documented per project
- Scenario set by state of charge, packaging and arrangement
- Ceiling-only scheme limited to about 15 ft of storage, 3 tiers, 40 ft ceiling
- In-rack sprinklers and horizontal barriers above those limits, above about 60 percent SOC, or for used cells
- Nothing stored above batteries in open racks; separation from other combustibles in piles
The practical consequence is that the insurer’s data sheet, not the code, usually sets the design on a lithium-ion storage project in New Jersey, Pennsylvania, Maryland and Delaware. Bringing the carrier’s engineer into the first design meeting, alongside the fire marshal, is the shortest path to a design both will accept.
Key Takeaway: Lithium-ion batteries have no commodity class in NFPA 13, so a warehouse that stores them cannot read its sprinkler design from the storage tables. The design becomes an engineered one under NFPA 13 Chapter 24 or the alternative methods clause, shaped by 6 factors: quantity (the 2024 IFC Section 320 threshold of 15 cubic feet where adopted), state of charge (30 percent and about 60 percent break points), packaging, storage height (about 15 ft for a ceiling-only scheme), the share of the array, and what the existing system was designed for. The insurer’s expectation, usually FM Global Data Sheet 7-112, is stricter than the code floor in every state except New York.
Frequently Asked Questions
Can lithium-ion batteries be classified as Group A plastics under NFPA 13?
No, not as a matter of the standard. NFPA 13 (2022) Table A.20.4(a) lists lithium-ion batteries as outside the standard’s protection scope, and the fire test series run by FM Global and the Fire Protection Research Foundation showed that a plastics design cannot be assumed to control a bulk battery fire. Some AHJs accept a cartoned unexpanded plastics design for small quantities of batteries installed in products; that is a project-specific acceptance, not a classification.
Does an ESFR warehouse need changes to store lithium-ion batteries?
Conditional: an existing ESFR design often covers the ceiling-only scenarios in FM Global Data Sheet 7-112, because the data sheet’s scheme uses large-orifice quick-response heads at a comparable pressure, but the storage height, state of charge and packaging limits still apply, and anything above them needs in-rack sprinklers and barriers. The hydraulic calculation has to be checked against the scheme, not assumed to pass.
Does 2024 IFC Section 320 apply in New Jersey or Pennsylvania?
No. The New Jersey Uniform Fire Code is on a 2018 IFC basis and the Pennsylvania Uniform Construction Code is on the 2021 I-Codes, and Section 320 first appeared in the 2024 IFC. In both states the fire official decides under the high-piled storage chapter and the alternative methods clause, and the 2021 IFC treats lithium-ion batteries as a high-hazard commodity for that purpose. New York State adopted the 2024 IFC in its 2025 Uniform Code, so Section 320 applies there.
Does a low state of charge remove the need for an engineered sprinkler design?
No. A state of charge at or below 30 percent waives some 2024 IFC Section 320 requirements, such as the technical report and the 2-hour separation, and it qualifies the storage for the least demanding FM Global scheme, but sprinklers designed to an accepted basis are still required and the state of charge has to be verifiable for every lot stored.
More in Storage and Commodities
- When Does IFC Chapter 32 Apply to High-Piled Storage?
- Why Do Freezer Sprinkler Pipes Get Ice Plugs?
- What Fire Protection Does a Warehouse Need?
- What Fire Protection Do Cold Storage and Food Plants Need?
- What Rules Apply to Carpet, Mattress and Furniture Storage?
- What Fire Protection Does a Retail Store Need?
This article is general information, not a substitute for a project-specific commodity classification and sprinkler design. Code editions, insurer data sheets and reviewer practice change; confirm the adopted code, the insurer’s current requirements and the authority having jurisdiction for the project.
Adding Lithium-Ion Products to a Warehouse?
Send the inventory, the rack layout and the current sprinkler hydraulic data. DGA classifies the commodity, selects the design basis the fire marshal and the insurer will both accept, and prepares the high-piled storage plan and technical report. Project briefs get confirmation and preliminary code feedback within one business day.