Storage and Commodities · Trigger
When Are In-Rack Sprinklers Required?
Reviewed by a licensed Professional Engineer · NY, NJ, PA, MD, DE · Last reviewed · Code basis: NFPA 13 Ch. 20 to 25 (2022; 2019 PA and MD; 2016 NYC App. Q; 2025 DE)
General guidance, not a code determination for any project. Confirm the adopted code and local amendments with the authority having jurisdiction.
In-rack sprinklers are required when rack storage goes beyond what ceiling-only sprinklers are listed and tested to protect: Class I to IV commodities above 25 ft under control mode density area (CMDA) sprinklers, a ceiling above 45 ft with even the largest early suppression fast response (ESFR) sprinklers, and any rack with solid shelves over 20 sq ft, whatever the height. Open-top containers and exposed expanded Group A plastics narrow the ceiling-only options further. The rules sit in National Fire Protection Association (NFPA) 13, Standard for the Installation of Sprinkler Systems, Chapters 20 through 25, and the in-rack design itself is Chapter 25.
The trigger is never a single number. The storage height, the ceiling height, the commodity class and the way the rack is built are read together, and the first one to exceed a ceiling-only table is the one that puts sprinklers inside the rack. This article lists those thresholds, explains how each one is measured, sets out the alternatives that keep a project at the ceiling, and describes what a project owes once in-rack sprinklers are required.
At a Glance: In-Rack Sprinkler Triggers
- Thresholds: Class I to IV or Group A plastic rack storage over 25 ft under CMDA; a ceiling over 45 ft with K-22.4 or K-25.2 ESFR (over 40 ft with K-16.8); solid shelves over 20 sq ft; open-top containers and exposed expanded Group A plastics outside the ESFR limits; sloped or obstructed ceilings outside the ESFR limits.
- Code, edition, section: NFPA 13 (2022) Chapter 20 (rack and shelf rules), Chapter 21 (CMDA ceiling-only limits), Chapter 22 (CMSA limits), Chapter 23 (ESFR limits), Chapter 25 (in-rack design). PA and MD apply the 2019 edition, NYC the 2016 edition through Appendix Q of the 2022 Building Code, DE the 2025 edition.
- Main exceptions: a larger K-factor ESFR or a control mode specific application (CMSA) sprinkler that lists the height; horizontal barriers with a reduced in-rack scheme; lowering the storage height; reclassifying the commodity; replacing solid shelves with wire decking.
- What applies once triggered: a Chapter 25 in-rack system with sprinklers at set levels and spacing, flue spaces kept open, the in-rack demand balanced with the ceiling demand, and a revised sprinkler permit and high-piled storage plan.
- Permit or filing: a sprinkler work permit (New York City Department of Buildings, New Jersey construction permit, Pennsylvania Uniform Construction Code permit, Maryland and Delaware State Fire Marshal plan review) plus the high-piled storage permit where the fire code requires one.
- Who decides: the fire protection engineer who stamps the storage analysis, confirmed by the authority having jurisdiction (AHJ) at plan review. FM Global and other insurers may ask for in-rack sprinklers below the code trigger.
What Thresholds Put Sprinklers Inside the Rack?
NFPA 13 organizes storage protection by sprinkler type. Chapter 21 sets the ceiling-only limits for CMDA sprinklers, both over racks and over palletized and solid-piled storage (which never needs in-rack sprinklers because there is no rack). Chapter 22 does the same for CMSA sprinklers, Chapter 23 for ESFR, Chapter 24 covers alternative listing-based designs, and Chapter 25 is where a project lands when a rack arrangement passes those limits. Chapter 20 adds the rack and shelf conditions that force in-rack sprinklers no matter how low the storage is.
The table lists the thresholds as they read in the 2022 edition. Pennsylvania and Maryland projects use the 2019 edition, which carries the same numbers in the same chapters, and New York City projects use the 2016 edition, where the same rules, including the solid shelving rule, sit in Chapters 16 and 17.
| Condition | Ceiling-only limit | In-rack required when | NFPA 13 (2022) basis |
|---|---|---|---|
| Class I to IV, CMDA ceiling | Storage to 25 ft on the ceiling-only density tables | Storage exceeds 25 ft, unless a CMSA (Chapter 22) or ESFR (Chapter 23) design covers the height | Chapter 21 (21.4.1); over 25 ft goes to Chapter 25 |
| Group A plastics, CMDA ceiling | Set by the Chapter 21 plastics tables, never above 25 ft; no ceiling-only entry for exposed expanded plastics | Storage exceeds the Chapter 21 plastics limits, or the plastic is exposed expanded | Chapter 21, Group A plastics rack storage; over 25 ft goes to Chapter 25 |
| ESFR K-16.8 | Ceilings up to 40 ft for Class I to IV and cartoned nonexpanded plastics | The ceiling exceeds the table entry for the commodity | Chapter 23, Table 23.3.1 (indexed by maximum ceiling height) |
| ESFR K-22.4 or K-25.2 | Ceilings up to 45 ft, the top of the ESFR table | The ceiling exceeds 45 ft, or the commodity is not on the table | Chapter 23, Table 23.3.1 |
| Solid shelving | Shelf area of 20 sq ft or less, or shelving more than 50 percent open with flues kept | Any solid shelf over 20 sq ft: in-rack sprinklers at levels not more than 6 ft apart for shelves over 20 up to 64 sq ft, and below every shelf above 64 sq ft or where shelf levels are more than 6 ft apart | Chapter 20 (20.5.3.1.1, 20.19.3) |
| Open-top containers | None: open-top containers fall outside the Chapter 21 to 25 rack criteria, and ESFR is not permitted for them | Combustible open-top containers are stored in racks at any height; the protection needs a design outside the standard tables | Chapter 20 (20.3.3); Chapter 23 (23.1.3.2) |
| Exposed expanded Group A plastics | No CMDA ceiling-only entry; ESFR K-25.2 pendent covers storage up to 35 ft under a ceiling up to 40 ft | The ceiling is CMDA, or the storage or ceiling exceeds the ESFR limits | Chapter 21 (21.5, 21.6); Chapter 23 (23.4) |
| Multiple-row racks | Covered by the ceiling-only tables; the ESFR table treats single, double and multiple-row racks alike | Only when another condition in this table applies; the 2022 edition sets no maximum depth for multiple-row racks | Chapter 3 rack definitions |
| Ceiling slope and obstructions | ESFR ceilings up to 2 in 12 slope with the obstruction rules met | Slope is steeper, or obstructions cannot be cleared, so the ESFR table no longer applies | Chapter 14 ESFR slope and obstruction rules |
| Dry pipe ceiling system | Wet pipe ESFR, or dry pipe CMDA with the Chapter 19 area increase | The ESFR option is unavailable on a dry system unless the sprinkler is listed for dry pipe use, so the project falls back to CMDA limits | Chapter 14 (14.2.2) ESFR system type rules |
Two of these rows catch owners more than the rest. A warehouse at 24 ft of storage looks safe under the 25 ft CMDA line, but one bay of plywood decking over 20 sq ft puts in-rack sprinklers in that bay. And a 45 ft clear building with K-25.2 ESFR covers cartoned product at the top of the ESFR table, but a tenant who moves in with totes without lids, or with foam packaging, has changed the commodity, not the building, and the table no longer applies.
Figure 1: The In-Rack Threshold Ladder
- 1Palletized or solid-piled storage, no rackNever in-rack (no rack)
- 2Class I to IV in racks to 25 ft, CMDA ceilingCeiling-only (Chapter 21)
- 3Class I to IV or cartoned nonexpanded plastics under a ceiling up to 40 ft, ESFR K-16.8Ceiling-only (Chapter 23)
- 4Ceiling up to 45 ft, ESFR K-22.4 or K-25.2Ceiling-only (Chapter 23)
- 5Class I to IV over 25 ft with a CMDA ceilingIn-rack (Chapter 25)
- 6Ceiling over 45 ft with ESFRIn-rack levels (Chapter 25)
- 7Solid shelf over 20 sq ftIn-rack at any height (Chapter 20)
- 8Open-top containers, or exposed expanded Group A plastics past the ESFR limitsOutside the ceiling-only tables (Chapters 20 and 23)
How Is Each Threshold Measured?
Storage height is measured from the floor to the top of the highest load the rack can hold, not to the top of the rack frame and not to the top beam. A rack with a 24 ft top beam and 5 ft loads is 29 ft of storage. NFPA 13 Chapter 20 ties the design to the maximum storage height the owner declares, so the number on the drawings becomes a limit the fire code inspector can enforce.
Ceiling height is measured from the floor to the underside of the roof deck or ceiling, not to the bottom of the joists or the sprinkler deflector. Clearance is the gap between the top of storage and the deflector; ESFR sprinklers need at least 36 in. of clearance (Chapter 14). The 2022 ESFR table is indexed by maximum ceiling height, and the CMDA tables by storage height, so both heights must be known before a K-factor is chosen.
Commodity classification sets which column of the table applies. Class I to IV, cartoned unexpanded Group A plastics, cartoned expanded, exposed unexpanded and exposed expanded each have a different ceiling-only limit, and the project is classified by its worst product at any height, not its average. DGA’s article on commodity classification under NFPA 13 explains how products land in a class; this article takes the class as given.
Shelf area is measured between flue spaces and between aisles. The 2022 definition (3.3.209) covers fixed, slatted and wire-mesh shelving, and loads placed so that they block the flue openings extend the shelf area. A shelf of 20 sq ft or less counts as open, and so does shelving more than 50 percent open with the flues kept (20.5.3.1.1).
Rack width decides whether a rack is single-row, double-row or multiple-row. The 2022 definitions treat a rack as multiple-row when it is more than 12 ft deep, or when single or double-row racks are separated by aisles under 3.5 ft and the overall width is over 12 ft. The 2022 edition sets no maximum depth for multiple-row racks. The article on how high storage can go under ceiling-only sprinklers walks through the full height ladder; the measurements above are the inputs it uses.
DGA designs rack storage protection, in-rack sprinkler systems and high-piled storage analyses across New York, New Jersey, Pennsylvania, Maryland and Delaware. Project briefs get confirmation and preliminary code feedback within one business day. See where DGA works →
What Exceptions and Alternatives Avoid In-Rack Sprinklers?
A project that has crossed a threshold has five ways back to the ceiling, and most warehouses use two of them together. Each one changes an input to the tables rather than arguing with the tables.
| Alternative | What it changes | Where it stops working |
|---|---|---|
| Larger K-factor ESFR | Moves from K-14 or K-16.8 to K-22.4 or K-25.2, which reach a 45 ft ceiling (Chapter 23) | Ceilings over 45 ft, solid shelf racks, open-top containers, exposed expanded plastics beyond the K-25.2 limits, slopes over 2 in 12, dry systems |
| CMSA sprinklers | Control mode specific application heads list Class I to IV and cartoned plastics at heights above the CMDA line without in-rack (Chapter 22) | Fewer listed commodity and height pairs than ESFR; obstruction rules as strict |
| Horizontal barriers | Solid barriers at set rack levels with in-rack sprinklers under them limit fire to one tier, which Chapter 25 accepts with fewer sprinkler levels than the open-rack scheme | Still an in-rack system; it reduces levels and demand, it does not remove the trigger |
| Lower storage height | Posts a maximum storage height below the ceiling-only limit, enforced by the high-piled storage permit and load beam placement | Loses cube; the inspector will measure to the top of the load, not the beam |
| Reclassify or segregate commodities | Moves exposed plastics into cartons, caps open-top containers, or confines the worst product to a low bay with its own design area | Requires the owner to control what tenants store; a lease change can reopen the trigger |
| Remove solid shelves | Replaces plywood or sheet decking with wire mesh that meets the Chapter 20 open-area rule | Loads that close the flue still count as a solid shelf |
Some conditions have few or no ceiling-only options. Open-top containers are the clearest, because the container collects water above the fire. They fall outside the Chapter 21 to 25 rack criteria, and ESFR is not permitted for them (2022 20.3.3, 23.1.3.2); DGA’s article on why open-top bins defeat rack sprinklers covers that case. Exposed expanded Group A plastics in racks are close behind. The CMDA tables have no ceiling-only entry for them, and the only ESFR route is K-25.2 pendent sprinklers for storage up to 35 ft under a ceiling up to 40 ft (2022 23.4).
The choice between staying at the ceiling with a suppression-mode head and going into the rack is its own design question, covered in ESFR or in-rack sprinklers: which protects rack storage, and the ceiling-only choice between the two head types is covered in ESFR or CMSA sprinklers for a warehouse. This article stops at the trigger.
Figure 2: Does the Rack Need In-Rack Sprinklers?
Which NFPA 13 Edition Applies in Each State?
The thresholds in this article are the same in every state DGA serves. What changes is the edition of NFPA 13 the building code points to, which moves the chapter numbers and, for New York City, keeps the older chapter layout. The table lists the edition each jurisdiction enforces as of October 2026.
| Jurisdiction | Adopted code | NFPA 13 edition | Reviewer | Filing |
|---|---|---|---|---|
| New York State (outside NYC) | 2025 Uniform Code (2024 I-Codes) | 2022 | Local code enforcement official | Building permit with sprinkler plans; high-piled storage per Fire Code Chapter 32 |
| New York City | 2022 Building Code, Appendix Q; 2022 Fire Code | 2016 (per Appendix Q) | Department of Buildings (DOB); Fire Department (FDNY) for the storage permit | DOB sprinkler work permit; FDNY high-piled combustible storage permit |
| New Jersey | UCC, 2024 I-Codes (effective Aug 17, 2026); Uniform Fire Code on a 2018 International Fire Code (IFC) basis | 2022 | Municipal fire protection subcode official | Construction permit, fire protection subcode; local fire official for storage |
| Pennsylvania | UCC, 2021 I-Codes (Jan 1, 2026); no statewide fire code | 2019 | Municipal or third-party code official; Department of Labor & Industry (L&I) where it has jurisdiction | UCC building permit with sprinkler plans; local fire code where adopted |
| Maryland | 2021 International Building Code (IBC); NFPA 1 and NFPA 101 (2024) | 2019 by the IBC reference; the State Fire Marshal applies the NFPA 1 reference | County building official; State or local fire marshal | County permit with fire marshal plan review |
| Delaware | Regulation 701 (2026) with NFPA 1 and NFPA 101 (2024); IBC by county | 2025 | Office of the State Fire Marshal | State Fire Marshal plan review before the county building permit |
Maryland’s IBC reference and its NFPA 1 reference point to different NFPA 13 editions; the project applies the stricter reading or confirms with the fire marshal. Local amendments are not shown.
What Applies Once In-Rack Sprinklers Are Triggered?
Once a threshold is crossed, NFPA 13 (2022) Chapter 25 governs the design. The chapter sets the levels at which in-rack sprinklers are installed, the spacing along the rack, where face sprinklers are placed at the aisle, and the longitudinal and transverse flue spaces that must stay open so water reaches the fire. The ceiling system does not go away: the ceiling and in-rack demands are hydraulically balanced at their point of connection, and the hose stream allowance is added to size the supply (2022 25.1.10.5, 25.1.13).
The water demand often becomes the project’s real cost. A CMDA ceiling with in-rack levels can need more total flow than an ESFR ceiling alone, and the duration is set by the ceiling design. The fire pump, the underground main and the storage tank where there is one all have to be checked against the combined demand, and a building that passed with ceiling-only protection may not pass with in-rack sprinklers added.
In-rack sprinklers also change the operating rules of the warehouse. Every level of in-rack piping is a line that forklifts can hit, so rack operations have to be planned around it, and the owner’s high-piled storage permit must list the rack layout, the commodity class and the maximum storage height so that the AHJ can hold the tenant to it. A change in rack layout after the permit is a change to the sprinkler system and needs a new filing, which the industrial and high-hazard sector page describes for each state.
Insurers can bring the trigger forward. FM Global Data Sheet 8-9 uses its own ceiling-only limits and commodity classes, and an FM-insured warehouse is often asked for in-rack sprinklers, or for a specific ESFR K-factor, at heights the adopted NFPA 13 edition would accept at the ceiling. The code sets the floor; the carrier’s loss prevention recommendation can set a higher one, and the design should be checked against both before the rack order is placed.
Key Takeaway: In-rack sprinklers are required when any one input passes its ceiling-only table: Class I to IV over 25 ft under CMDA, a ceiling over 45 ft with the largest ESFR, or solid shelves over 20 sq ft at any height. Open-top containers and exposed expanded plastics fall outside most ceiling-only options. Measure storage to the top of the load and the ceiling to the deck, classify the worst commodity, and then read NFPA 13 (2022) Chapters 20 to 25 in the edition the AHJ adopted.
Frequently Asked Questions
Do ESFR sprinklers eliminate the need for in-rack sprinklers?
Conditional: ESFR sprinklers protect rack storage without in-rack sprinklers only within the ceiling heights listed for the commodity in NFPA 13 Chapter 23, on a wet system, with ceiling slope of 2 in 12 or less and with the obstruction rules met. ESFR cannot protect solid shelf racks unless in-rack sprinklers are added (2022 23.1.3.1), and it is not permitted for open-top containers (23.1.3.2).
Are in-rack sprinklers required for storage under 12 ft?
No, not by height. Below 12 ft the storage is usually not high-piled at all, and the ceiling-only tables cover it. Solid shelves over 20 sq ft can still require in-rack sprinklers at any height under NFPA 13 Chapter 20.
Does a wire mesh shelf count as a solid shelf?
No, when the shelving is more than 50 percent open and the flues are kept (NFPA 13 (2022) 20.5.3.1.1). Plywood, sheet metal and particle board decking are solid shelves, and loads or slip sheets that close the flue space can create a solid shelf on an open rack.
Can the storage height be lowered to avoid in-rack sprinklers?
Yes. Posting a maximum storage height below the ceiling-only limit is the most common way out, and the high-piled storage permit records that height. The inspector measures to the top of the load, so the rack beams and the load height both have to fit.
Does FM Global require in-rack sprinklers sooner than NFPA 13?
Conditional: FM Global Data Sheet 8-9 sets its own ceiling-only limits and commodity classes, and for some commodities and heights it asks for in-rack sprinklers or a larger ESFR K-factor where the adopted NFPA 13 edition would accept a ceiling-only design. The code sets the minimum; the carrier’s recommendation can require more.
More in Storage and Commodities
- When Does IFC Chapter 32 Apply to High-Piled Storage?
- Why Do Freezer Sprinkler Pipes Get Ice Plugs?
- What Fire Protection Does a Warehouse Need?
- What Fire Protection Do Cold Storage and Food Plants Need?
- What Rules Apply to Carpet, Mattress and Furniture Storage?
- What Fire Protection Does a Retail Store Need?
This article is general information, not a substitute for a project-specific sprinkler design or code analysis. Code editions, local amendments and reviewer practice change; confirm the adopted code and the authority having jurisdiction for the project.
Not Sure Whether the Racks Need In-Rack Sprinklers?