Licensed PEs in NY · NJ · PA · MD · DE · WA · OR · FLMon to Fri, 9am to 5pm ET · (646) 355-8274 · info@dgaconsulting.net · Project Desk

← All Services

Smoke control system design & testing

In a fire, smoke is often a greater threat to life safety than flame. DGA Fire Protection Engineering designs smoke control systems, from stairwell pressurization to atrium exhaust, that keep egress routes tenable and support firefighting operations.

Opens the Project Desk with your sentence. Our licensed PEs review every brief and reply within one business day.

Smoke control diagram: keeping the smoke layer above people in an atrium, per IBC Section 909 and NFPA 92

What’s Included

What smoke control system design and testing includes

DGA designs and tests smoke control systems for commercial, institutional, and high-rise residential buildings across New York, New Jersey, Pennsylvania, Maryland, Delaware, Washington, Oregon, and Florida. The firm’s engineers handle the full scope: design rationale, system design, sequence of operations, and acceptance testing support.

Stairwell pressurization

Design of pressurized exit stairs serving high-rise and underground occupancies.

Atrium and large-volume smoke exhaust

Exhaust system design for atriums, malls, and warehouses with high ceilings.

Zoned smoke control

Floor-by-floor smoke management strategies for complex buildings.

Design rationale and sequence of operations

Written documentation of the smoke control concept for permit and AHJ review, plus a detailed matrix defining system response to every alarm scenario.

Acceptance testing support

Test criteria development and field support through commissioning.

Smoke modeling

Computer modeling that shows the smoke layer stays above occupants for as long as they need to get out.

When It Applies

When smoke control system design and testing applies

Triggers

When you need it

  • High-Rise Stair Pressurization: Buildings that need stairwell or elevator hoistway pressurization to keep smoke out of exit routes.
  • Atriums & Large-Volume Spaces: Atriums, covered malls, and arenas that trigger smoke exhaust to keep exit paths tenable during egress.
  • Underground Occupancies: Below-grade spaces and other areas without natural venting that need mechanical smoke management.
  • Stages & Special Occupancies: Stages over 1,000 square feet and other spaces where the IBC requires smoke vents or mechanical smoke control.

What We Deliver

Smoke control engineering & testing

  • PE-Stamped Rational Analysis: The IBC Section 909 rational analysis, calculations, and fire modeling submitted for building department approval.
  • Pressure & Door Force Calculations: Pressure differentials and airflow checked against the 30 lbf door opening force limit.
  • Sequence of Operations: Fan, damper, and door release logic coordinated with the fire alarm and building management system.
  • Testing & Special Inspection Support: Field testing of pressure differentials, velocities, and door forces for AHJ acceptance and the certificate of occupancy.

Process

The design and testing process

01

Define the strategy

Building geometry, occupancy, and code requirements determine the smoke control approach.

02

Design

System layout, equipment selection, and the sequence of operations, coordinated with the mechanical engineer.

03

Document

Design rationale report, drawings, and specifications for permit.

04

Test

Acceptance testing criteria and field support through commissioning.

FAQ

Frequently asked questions

What’s the difference between smoke control and smoke detection?

Detection systems find the fire; smoke control systems manage where the smoke goes. The two systems are designed to work together, with detection initiating the smoke control sequence.

Does the firm coordinate with the mechanical engineer?

Yes. Smoke control is inherently multidisciplinary. The firm defines the fire protection strategy and sequence of operations and coordinates closely with the mechanical design team on equipment and ductwork.

Can the firm test an existing smoke control system?

Yes. The firm develops test protocols and supports periodic testing of existing installations.

Which states are you licensed in?

New York, New Jersey, Pennsylvania, Maryland, Delaware, Washington, Oregon, and Florida. Each project is sealed by a Professional Engineer licensed in the state where it is located.

Related Services

Related services

Construction supervisor directing work on a modern building site

Fire modeling & performance-based design

Computational fire modeling to support performance-based design.

Learn More

Engineers reviewing fire protection blueprints in an industrial plant

Commissioning & integrated system testing

Third-party commissioning and integrated testing of fire protection systems.

Learn More

Fire sprinkler pipe system under inspection at a worksite

Fire alarm system design

Fire alarm and detection system design for new and existing buildings.

Learn More

Quick inquiry

Ready when you are.

Your name, a way to reach you, and where the project is. A licensed PE replies within one business day. Every inquiry is confidential.

Prefer to describe it first? Open the Project Desk

FirmDGA Fire Protection Engineering
SheetFP-210
OfficesNew York · Harrisburg · Seattle
LicensedNY NJ PA MD DE WA OR FL
Rev10.2026
Sheet index