Licensed PEs in NY · NJ · PA · MD · DE · WA · OR · FLMon to Fri, 9am to 5pm ET · (646) 355-8274 · info@dgaconsulting.net · Project Desk

Review and seal · DGA Fire Protection Engineering

Engineer review and seal for fire protection drawings

Send your sprinkler, fire alarm or suppression drawings. A licensed PE reviews, comments and seals them, with a written fee and delivery date up front.

Licensed PE in NY, NJ, PA, MD, DE, WA, OR, FL · Reply within one business day · Written scope and fee before work starts

Get a written scope and fee

PDF, JPG, PNG or DWG. Up to 3 files, 25 MB each.

    What happens next: an engineer reads your request and replies within one business day with a written scope and fee. No obligation.

    Sound familiar?

    • The AHJ requires a PE seal.
    • Your engineer of record dropped off.
    • You want an independent review before you submit.
    • An owner or AHJ needs a peer review.

    What you get

    • Written review comments.
    • A check of the revised set.
    • Sealed drawings and calcs.
    • A letter of review.

    How it works

    1. 01Send the set

      Drawings, calcs and product data, and the AHJ that will review it.

    2. 02Written fee and delivery date

      You get both in writing before work starts.

    3. 03Review comments

      A licensed PE reviews the set and sends written comments.

    4. 04Seal once the comments are resolved

      The seal follows a real review. That is what makes it valid.

    Reviews and recent work

    5.0★★★★★

    Average rating on Google. Every review is public.

    Read every review on Google
    • “I have worked with John for 8 years, and now with his team at DGA. They are knowledgeable, responsive and among the best fire protection engineers I have ever met. I have never worked with a firm that knows all facets of fire protection the way DGA does.”

      Stephen S., PE · Engineering firm principal

    • “The sequence of operations was thorough, they were on-site for the integrated testing and worked through every deficiency with our controls contractor until it all passed.”

      Sabrina S. · Smoke control design and commissioning, medical office building

    • “They were responsive, explained the code issues in plain language, and turned around stamped drawings on schedule.”

      Layla · Sprinkler design and hydraulic analysis, warehouse

    Licensed PE in New York, New Jersey, Pennsylvania, Maryland, Delaware, Washington, Oregon and Florida.

    • Data center · New York

      Detection and suppression review for a data center fit-out.

    • Warehouse club · Florida

      Rack storage sprinkler review.

    • Data center · Oregon

      Preaction sprinkler and clean agent review for a data center campus.

    • Apartments, condos and co-ops · New York

      Smoke control and voice evacuation review for a residential high-rise.

    Questions

    What does it cost?

    We send a written fee after we see the scope. Most jobs are a fixed fee. Sending your request and getting the fee costs nothing, with no obligation.

    How long does it take?

    Your written scope gives a delivery date for our work. Review time at the AHJ, the official who approves your plans, is set by that office, and we tell you what to expect there.

    Who approves it?

    The AHJ: the building department, fire marshal or fire code official for the address, or your insurer when the request comes from them. We write to what that reviewer requires and answer its comments.

    Do you install?

    No. DGA Fire Protection Engineering does engineering only. Your contractor installs; we design, review, seal and answer the reviewer.

    What should I send?

    The full set: drawings, calcs, product data and the AHJ that will review it.

    Send your drawings

    A licensed engineer replies within one business day with a written scope and fee. Or call (646) 355-8274.

    PDF, JPG, PNG or DWG. Up to 3 files, 25 MB each.

      What happens next: an engineer reads your request and replies within one business day with a written scope and fee. No obligation.

      ← All Services

      Third-party review & peer review

      DGA Fire Protection Engineering provides independent fire protection plan review and peer review of sprinkler, fire alarm, standpipe, and life safety submittals. Whether the client is an AHJ needing independent plan review capacity, an owner verifying a design team’s work or a contractor’s NFPA 25 inspection reports, or an engineer seeking peer review before stamping, independent third-party review reduces risk for everyone involved.

      Opens the Project Desk with your sentence. A licensed PE reviews every brief and replies within one business day.

      Third-party review process: submittal received through approval recommendation

      What’s Included

      What third-party review includes

      DGA provides third-party fire protection plan review and peer review services across New York, New Jersey, Pennsylvania, Maryland, Delaware, Washington, Oregon, and Florida. A licensed Professional Engineer reviews designs against the applicable codes with the same rigor DGA applies to its own work.

      Plan review for AHJs

      Independent review of fire protection drawings and calculations submitted for permit, with written comment reports, including fire protection subcode reviews for New Jersey municipalities.

      Peer review for design teams

      Pre-stamp review of another engineer’s fire protection design, identifying code issues before they become field problems.

      Owner’s representative review

      Verification that the design meets the owner’s requirements and applicable codes, independent of the design team, plus NFPA 25 inspection report review for existing systems.

      Code compliance verification

      Systematic checking of sprinkler, alarm, standpipe, and life safety designs against NFPA standards and local amendments.

      Written findings

      Clear comment reports with code references for every finding, suitable for permit records.

      NFPA 25 report review

      Contractor inspection reports and deficiency lists checked item by item, so owners fix what the standard requires first.

      When It Applies

      When third-party review applies

      Triggers

      When you need it

      • AHJ Backlogs & Complex Submittals: Agencies that need outside PE review capacity for complex or non-standard submittals.
      • Owner Due Diligence: Owners and developers who want independent verification of a large fire protection design.
      • Design Team Peer Review: Architects and engineers who want a second review before issuing sealed documents.
      • Code Disputes: Disagreements between owners, designers, contractors, insurers, and AHJs that need a neutral technical opinion.

      What We Deliver

      Independent review deliverables

      • Code & Calculation Reviews: Drawings, specifications, hydraulic calculations, and battery calculations checked against NFPA standards and local code.
      • Itemized Comment Logs: Line-item comments covering non-compliance, coordination conflicts, and over-design.
      • Plan Review Reports: Review letters and approval recommendations prepared for the AHJ.
      • Technical Memorandums: PE-signed opinions on disputed code interpretations.

      Process

      The review process

      01

      Receive

      Drawings, calculations, and the applicable code editions.

      02

      Review

      Systematic check against NFPA standards, IBC, and local amendments.

      03

      Report

      Written findings with code references, organized for action.

      04

      Close

      Follow-up review of resubmittals until findings are resolved.

      FAQ

      Frequently asked questions

      Are review engagements truly independent?

      Yes. Third-party review engagements are structured so the firm has no design role on the project. Its only interest is code compliance.

      Can the firm review work in progress, or only finished drawings?

      Both. Early-stage reviews catch issues when they are cheapest to fix, and permit-stage reviews verify the final product.

      Does DGA stamp reviewed drawings?

      No. The design engineer of record stamps their own work. The firm’s product is the independent review report.

      Which states are you licensed in?

      New York, New Jersey, Pennsylvania, Maryland, Delaware, Washington, Oregon, and Florida. Each project is sealed by a Professional Engineer licensed in the state where it is located.

      Who hires a third-party reviewer?

      Owners and developers who want an independent check before construction, and code officials who need technical review capacity. The reviewer works for the client, not the installer.

      Related Services

      Related services

      Construction supervisor directing work on a modern building site

      Fire code consulting services

      Code interpretation and application across NFPA, state, and municipal frameworks.

      Learn More

      Engineers reviewing fire protection blueprints in an industrial plant

      Fire protection engineering design

      Integrated sprinkler, alarm, and hydraulic design for new and existing buildings.

      Learn More

      Fire sprinkler pipe system under inspection at a worksite

      Expert witness & litigation support

      Independent technical opinions and testimony for fire protection disputes.

      Learn More

      Quick inquiry

      Ready when you are.

      Your name, a way to reach you, and where the project is. A licensed PE replies within one business day. Every inquiry is confidential.

      Prefer to describe it first? Open the Project Desk

      FirmDGA Fire Protection Engineering
      SheetFP-213
      OfficesNew York · Harrisburg · Seattle
      LicensedNY NJ PA MD DE WA OR FL
      Rev11.2026
      Sheet index