Emergency response planning for data centers and critical facilities

A fire official, an insurer or a client asks to see your emergency response plan. A good one tells your team what to do in the first minutes, tells the fire department what is inside before they arrive, and has been tested before it is needed. We write the plan around your fire protection systems, your hazards and the standards that apply, then help you train to it.

  • Plans written to NFPA 75, NFPA 1660 and the adopted fire code
  • FM data sheet reviews and insurer recommendation responses
  • Lithium-ion battery and energy storage emergency planning
  • Pre-incident plans, drills and tabletop exercises with your fire department

A site plan, your insurer’s recommendation or the request you received is enough to start. You get a free written proposal within one business day.

Opens the Project Desk with your sentence. Our licensed PEs review every brief and reply within one business day.

  • Licensed in eight statesSealed reports and letters in NY, NJ, PA, MD, DE, WA, OR and FL.
  • Built on your systemsThe plan follows what your detection, sprinklers and suppression really do.
  • Written for two readersYour staff and the fire department each get the pages they need.
  • Free written proposalScope, schedule and price before you commit to anything.
  • Fire protection onlyIt is the only kind of engineering we do.
What a data center emergency response plan answers A schematic floor plan of a hypothetical data center with six numbered locations a plan covers: the entrance where responders are met, the data hall, the battery room, the generator yard, the sprinkler valve room and the power shutoffs. DATA CENTER HYPOTHETICAL BUILDING · NOT A DGA PROJECT · SCHEMATIC DATA HALL VALVEROOM POWER UPS AND BATTERIES SECURITY DESK ENTRANCE GENERATOR YARD FDC HYDRANT STREET 1 2 3 4 5 6 1 WHERE CREWS MEET YOUEntrance, alarm panel, plans,keys and a named contact. 2 THE DATA HALLWhat detects, what discharges,what shuts down, and when. 3 THE BATTERY ROOMChemistry, gas detection,ventilation, and who stays out. 4 GENERATORS AND FUELShutoffs, fuel quantityand spill control. 5 VALVES AND WATERWhich valve feeds what, andwho stands by to keep it open. 6 POWERUtility, UPS and emergencypower off: who decides. Illustration only.
Six things a data center plan answers before the fire department arrives. Hypothetical building, not a DGA project. Schematic.

What’s included

What emergency response planning includes

Most sites already have a binder. The trouble starts when the binder describes a building that has since changed, or when nobody on the night shift has opened it. An emergency response plan is only useful if it matches the systems in the building and the people on site, and if the fire department has seen it before the day it matters.

We start from the fire protection: what detects, what discharges, what shuts down and in what order. The plan is written around that sequence and the hazards in the building, then checked against the standards and insurer guidance that apply to you. Data centers are where this matters most, because a wrong move in the first five minutes can cost as much as the fire, but the same method works for warehouses, plants, hospitals and battery sites.

Hazard and system survey

We walk the site, read the drawings and talk to the people who run it. The result is a plain-words summary of each fire protection system: what sets it off, what it does when it operates and what your team has to do next.

Emergency fire plan

Who does what in the first minutes: confirming the alarm, calling the fire department, meeting the crews, standing by the sprinkler valve and deciding on power. It doubles as the fire safety and evacuation plan where the fire code asks for one.

Damage control and recovery

Protecting equipment from water and smoke, salvage priorities, and putting fire protection back in service after it operates. We write the fire protection side so it fits the business continuity plan your operations team owns.

Battery and energy storage planning

Lithium-ion UPS and energy storage systems bring their own rules: an emergency operations plan covering shutdown, gas and ventilation, damaged battery removal and who may go back in, written to NFPA 855 and the adopted fire code.

Pre-incident plan for the fire department

Site sheets the first crews can read in a minute: access, hydrants and connections, valves, utility shutoffs, hazards and contacts. We walk the building with the fire department where they are willing, so the plan is not their first look.

Training, drills and upkeep

Named roles for your emergency response team, a training outline, tabletop exercises and drill scenarios. Then a yearly review, and an update whenever the building, the batteries or the staffing changes.

The rules

Who asks for a plan, and what they ask for

There is no single emergency response plan rule. A data center can be asked for one by the fire code, by a battery permit, by OSHA, by its insurer and by its own customers, each using different words for overlapping documents. The table is a starting point. We confirm which editions and amendments apply to your site before we write anything.

Who asksWhere it appliesWhat it asks for, in plain words
NFPA 75Fire protection of information technology equipmentData centers and IT equipment roomsChapter 12 of the 2024 edition calls for three written plans: an emergency fire plan, a damage control plan and a recovery procedures plan.
NFPA 1660Emergency, continuity and crisis managementAny organization building an emergency management programThe 2024 edition combines NFPA 1600, NFPA 1616 and NFPA 1620 in one standard: program management, planning, response and recovery, exercises, and pre-incident planning with responders.
NFPA 855 and the fire codeStationary energy storage systemsBattery systems above the code thresholds, which can include lithium-ion UPSEmergency planning and training (Section 4.3 in the 2023 edition): an emergency operations plan for shutdown, damaged equipment and staff training. The 2026 edition adds an emergency response plan for responders, with a yearly review and refresher training.
International Fire Code, Chapter 4As adopted and amended where you areThe occupancies listed in Section 403Fire safety and evacuation plans (Section 404), drills (405) and employee training (406), reviewed yearly or when the building changes.
OSHA29 CFR 1910.38 and 1910.39Employers, where an OSHA standard calls for oneAn emergency action plan and a fire prevention plan: how to report an emergency, how people get out, who stays for critical operations, and how everyone is accounted for.
FM data sheetsFM, formerly FM GlobalFM-insured sites, and owners who build to FM guidanceData Sheet 10-1 covers pre-incident and emergency response planning for fire, flood, freeze, earthquake and more, with an emergency response team that has assigned roles. Data Sheet 5-32 covers data centers, 5-33 lithium-ion energy storage and 10-7 impairments.

Editions and local amendments decide what applies. New York City adds its own plan requirements through its Fire Code and Fire Department rules. Insurer data sheets are recommendations, not law, but they often decide the terms of coverage.

Data centers

The first 30 minutes, decided in advance

In a data center the hard questions arrive together. Does the alarm mean a fire or a failed fan? Who can power down a hall, and who has to be asked first? Is it safe to open the battery room door? A plan answers those on a quiet day, in writing, with the fire department in the room. Three examples show the kind of decisions a plan settles.

Example 1

Smoke alarm in the data hall

  1. 0 minSystemsEarly warning smoke detection goes into alarm. The plan already says what shuts down on its own.
  2. 2 minYour teamThe person in charge confirms the location at the panel. The fire department is called even if the alarm system already did.
  3. 5 minYour teamOne person stands by the sprinkler valve so it stays open. Any power-down follows the written sequence.
  4. 10 minFire departmentCrews are met at the entrance with the site sheet: what is in the room and where the shutoffs are.
  5. 30 minTogetherEquipment is protected from water and smoke, and any system that operated goes back in service.
Example 2

Battery alarm in the UPS room

  1. 0 minSystemsBattery monitoring or gas detection alarms. The plan lists the ventilation and shutdown steps that happen automatically.
  2. 2 minYour teamNobody goes in to look. The room is treated as hazardous until the fire department says otherwise.
  3. 5 minYour teamThe fire department and the battery vendor’s emergency contact are called. Everyone is accounted for.
  4. 10 minFire departmentCrews are briefed outside with the battery sheet: chemistry, quantity, location and disconnects.
  5. AfterTogetherDamaged batteries can stay hazardous. The plan covers monitoring, removal and who is allowed back in.
Example 3

Water where it should not be

  1. 0 minSystemsA waterflow alarm or leak detection trips.
  2. 2 minYour teamIs a sprinkler operating on a fire, or is a pipe leaking? The plan says how to tell.
  3. 5 minYour teamIf there is any chance of fire, the valve stays open. If it is a leak, the smallest section possible is isolated.
  4. 10 minYour teamCovers and drains from the salvage kit protect the equipment below.
  5. 30 minTogetherA closed valve is logged as an impairment, the insurer is told where required, and the system goes back in service.

Illustration only. The steps and times in your plan follow your systems, your staffing and your fire department’s procedures.

When it applies

When emergency response planning applies

Triggers

When you need it

  • A customer or tenant asks for it: Colocation customers, enterprise tenants and lenders ask to see the plan during due diligence, and they read it.
  • An insurer recommendation: A visit from FM or another insurer ends with a recommendation to write, update or test the emergency response plan.
  • A fire official’s request: Plan review, a battery system permit or an inspection asks for a fire safety, evacuation or emergency operations plan.
  • New batteries, or more of them: Moving to lithium-ion UPS or adding energy storage changes the hazards, and the plan has to change with them.
  • A new or expanded site: Commissioning is the best time to write the plan, while the people who know the systems are still on site.
  • An incident or a near miss: An event showed the plan was out of date, or that nobody had read it.

What you receive

Emergency response planning deliverables

  • Emergency fire plan: With the damage control plan and recovery procedure inputs NFPA 75 describes.
  • Fire safety and evacuation plan: Where the adopted fire code requires one.
  • Emergency operations plan: For battery and energy storage systems.
  • Pre-incident plan sheets: For the fire department, in a format they can use on arrival.
  • System summary: What each fire protection system does when it operates, in plain words.
  • Roles and training: Emergency team roles, a training outline and drill scenarios.
  • Sealed letter or response: An engineer’s letter or a written response to an insurer recommendation, where one is needed.

Process

How a plan gets written, tested and kept current

  1. 01

    To start

    Send the request

    Tell us who is asking for the plan and why, with a site plan and whatever plan you have today. We reply with a free written proposal: scope, schedule and price.

  2. 02

    On site

    Survey and listen

    We walk the building, read the fire protection drawings and sequences, and talk to operations, security and, where they are willing, the fire department.

  3. 03

    In draft

    Write and review

    The plans are drafted against the standards that apply, then reviewed with your team. Comments from your insurer or the fire official are answered in writing.

  4. 04

    Every year

    Train, drill and update

    A tabletop exercise or drill shows what the plan missed. It is reviewed every year and after any change to the building, the batteries or the staffing.

Questions

Frequently asked questions

What is an emergency response plan?

A written plan for what the people on site do when something goes wrong: who confirms the alarm, who calls the fire department, who meets the crews, what gets shut down and what must stay on. A complete one also covers protecting equipment during the event, getting back in service afterward, and the training and drills that keep it real.

Does a data center need an emergency response plan?

In practice, yes. NFPA 75, the standard most data centers are designed to, calls for an emergency fire plan, a damage control plan and a recovery procedures plan. Battery systems above the code thresholds need emergency planning and training under NFPA 855 and the fire code. Insurers and customers ask for the plan as well. Which of these is a legal requirement for your site depends on the codes your jurisdiction has adopted.

What does FM ask for in an emergency response plan?

FM, formerly FM Global, publishes Property Loss Prevention Data Sheets. Data Sheet 10-1 covers pre-incident and emergency response planning: an emergency response team with assigned roles, a pre-incident plan worked out with the fire service, and plans for hazards such as fire, flood and freeze. Data Sheet 5-32 adds guidance for data centers. These are insurer recommendations, not law. We review your plan against the data sheets and write the response to a recommendation.

How is an emergency response plan different from a business continuity plan or a pre-incident plan?

The emergency response plan covers the event itself and the hours after it. A business continuity plan covers how the business keeps running or recovers, and it usually belongs to operations or IT. A pre-incident plan is the short package the fire department uses on arrival: access, water, valves, shutoffs and hazards. The three should agree with each other, and that is part of what we check.

Do lithium-ion batteries change the plan?

Yes. A battery in thermal runaway releases flammable and toxic gas and can reignite after it appears to be out. The plan has to say what the detection and ventilation do, who stays out of the room, what the fire department is told on arrival and how damaged batteries are handled afterward. NFPA 855 and the fire code set out emergency planning and training requirements for these systems.

How often should the plan be reviewed, and are you the fire department?

The International Fire Code calls for required plans to be reviewed or updated yearly or when the building changes, and FM guidance says at least once a year. A change in batteries, layout, systems or staffing is a reason to update sooner. We are a private fire protection engineering firm, not the fire department or a code official. We write the plan with you and work with them.

Related

Related services

Engineers inspecting industrial equipment on site

PE inspections & certification letters

Independent inspections and sealed letters for insurers, lenders and fire officials.

Learn More

Project team reviewing plans on site

Fire code consulting

Which codes and editions apply to your site, and what they ask of an existing building.

Learn More

Exit doors in a commercial building

Life safety & egress consulting

Exit capacity, evacuation routes and the life safety plans an evacuation plan is built on.

Learn More

Been asked for an emergency response plan, or not sure the one on the shelf still matches the building? Send DGA the site and the request and get a free written proposal. The firm replies within one business day.

Quick inquiry

Ready when you are.

Your name, a way to reach you, and where the project is. A licensed PE replies within one business day. Every inquiry is confidential.

Prefer to describe it first? Open the Project Desk

FirmDGA Fire Protection Engineering
SheetFP-222
OfficesNew York · Harrisburg · Seattle
LicensedNY NJ PA MD DE WA OR FL
Rev11.2026
Sheet index