What fire protection does a parking garage need?

General guidance, not a code determination for any project. Confirm the adopted code and local amendments with the authority having jurisdiction.

A parking garage needs some mix of sprinklers, a standpipe, ventilation and freeze protection, and whether it is open or enclosed, what sits above it and how cold it gets decide which apply. Under the 2021 and 2024 International Building Code (IBC), an enclosed garage gets mechanical ventilation, plus sprinklers once its fire area passes 12,000 sq ft or it sits beneath another occupancy other than Group R-3, while an open garage ventilates through its wall openings and needs sprinklers above a 48,000 sq ft fire area. Either type takes a standpipe at four or more stories, or when a floor sits more than 30 ft above or below fire department vehicle access, and piping that can freeze needs a dry pipe, preaction or antifreeze design.

Local rules move those lines. New York City (NYC) sprinklers any building over 5,000 sq ft whose main use is parking, and in Maryland and Delaware the Life Safety Code of the National Fire Protection Association (NFPA), NFPA 101 (2024), and in Delaware NFPA 88A (2023), call for sprinklers in new parking structures of any size. This guide covers each system in turn, with links to the DGA Fire Protection Engineering articles that go deeper.

At a Glance: Parking Garage Fire Protection

  • Threshold(s) with units: sprinklers in an enclosed garage with a fire area over 12,000 sq ft or beneath another occupancy other than Group R-3, in an open garage with a fire area over 48,000 sq ft (2021 and 2024 IBC), in any garage where a story with an occupant load of 30 or more sits 55 ft or more above fire department vehicle access (2021 IBC Section 903.2.11.3), in commercial motor vehicle storage over 5,000 sq ft, and in NYC in any building over 5,000 sq ft whose main use is parking; a standpipe at four or more stories above or below grade plane, or with a floor more than 30 ft above or below fire department vehicle access (2021 IBC); freeze protection wherever sprinkler piping cannot be kept at 40 F or above under NFPA 13 (2022).
  • Code, edition, section: IBC Sections 406.5 (open garages), 406.6 (enclosed garages), 903.2.10 and 905.3.1, in the 2024 edition (New Jersey, New York State, the City of New Castle in Delaware), the 2021 edition (Pennsylvania, Maryland county permits, New Castle and Sussex counties) and the 2018 edition (Kent County and Wilmington); 2022 NYC Building Code Section 903.2.10; NFPA 13 (2022) Section 16.4.1.1 and Chapter 8; NFPA 101 (2024) Chapter 42 in Maryland and Delaware; NFPA 88A (2023) and NFPA 130 (2023) in Delaware; NFPA 130 (2023) for New York State rail stations.
  • Main exceptions: enclosed garages beneath Group R-3; open garages at or under 48,000 sq ft of fire area unless the 55 ft rule applies, and every open garage under the 2018 IBC; Class I in place of Class III standpipes in parking garages (Section 905.3.1, exception 3); no ventilation beyond the wall openings in a garage that passes the open garage test (Section 406.5.10).
  • What applies once triggered: an NFPA 13 sprinkler system throughout the garage, wet where heated and dry pipe, preaction or listed antifreeze where the piping can freeze; a standpipe built to NFPA 14, dry only where the piping is subject to freezing (Section 905.8); mechanical ventilation and exhaust in an enclosed garage (Section 406.6.2); electric vehicle (EV) chargers installed under NFPA 70 (Section 406.2.7).
  • Permit or filing: sprinkler and standpipe drawings with hydraulic calculations, filed with the NYC Department of Buildings (DOB) in DOB NOW: Build, with the building permit in New York State and Pennsylvania (suppression permits in Philadelphia and Pittsburgh), under the fire protection subcode of the construction permit in New Jersey, through the county permit office in Maryland and for State Fire Marshal plan review in Delaware.
  • Who decides: the building code official, or in New Jersey the fire protection subcode official, applies the IBC; the fire marshal applies NFPA 1 and NFPA 101 in Maryland and Delaware; the registered design professional documents whether the garage is open or enclosed, and the authority having jurisdiction (AHJ) accepts or rejects that classification.

What fire protection does a parking garage need, open or enclosed?

A garage’s fire protection starts with whether it is open or enclosed. A garage counts as open only when every tier passes the wall openings test in 2021 IBC Section 406.5.2, and it then needs no other ventilation (Section 406.5.10). A garage that fails the test is enclosed: it needs mechanical ventilation and exhaust under the International Mechanical Code (Section 406.6.2) and reaches the sprinkler threshold at a quarter of the open garage’s fire area.

The second question is what shares the building. An enclosed garage beneath any other occupancy group except R-3, such as a one- or two-family dwelling, needs sprinklers at any size (Section 903.2.10), and a garage inside a building with a Group R fire area is sprinklered with the rest of it (Section 903.2.8). Where apartments sit over a garage on a podium, they may use NFPA 13R only within the IBC’s height limits, which DGA’s article on NFPA 13, 13R and 13D compared sets out by state. The third question is whether the piping can freeze, which decides between wet and dry systems for both the sprinklers and the standpipe.

Figure 1: Which fire protection does this garage get?

A new parking garage, standing alone or part of a larger building
Does every tier pass the open parking garage openings test in IBC Section 406.5.2?
YesOpen garageVentilation through the wall openings; sprinklers once the fire area exceeds 48,000 sq ft (2021 and 2024 IBC) or a story with an occupant load of 30 or more sits 55 ft or more above fire department vehicle access (2021 IBC)
NoEnclosed garageMechanical ventilation and exhaust (Section 406.6.2); sprinklers once the fire area exceeds 12,000 sq ft
Is it an enclosed garage beneath another occupancy, or part of a building with a Group R fire area?
YesSprinklers at any sizeEnclosed garage beneath any group other than R-3 (Section 903.2.10); the whole building where it holds a Group R fire area (Section 903.2.8)
NoFire area and local rules decideNYC sprinklers parking buildings over 5,000 sq ft; NFPA 101 (2024) in Maryland and Delaware reaches new garages of any size
Can any sprinkler or standpipe piping fall below 40 F?
YesDry pipe, preaction or listed antifreezeDry pipe valve in a heated room; a dry Class I standpipe is permitted where one is required (Sections 905.3.1 and 905.8)
NoWet pipe systemPiping kept at 40 F or above (NFPA 13 (2022) Section 16.4.1.1); a wet standpipe where one is required
Three questions set a garage’s protection: the IBC Section 406.5.2 openings test sorts it into open (sprinklers above a 48,000 sq ft fire area) or enclosed (sprinklers above 12,000 sq ft, plus mechanical ventilation); an enclosed garage beneath another use other than Group R-3, or a building with a Group R fire area, brings sprinklers at any size; and piping that can fall below 40 F takes a dry pipe, preaction or antifreeze sprinkler system under NFPA 13 (2022) and permits a dry Class I standpipe.

What does the code require for a parking garage, system by system?

The table lists each system a new garage may need, the threshold that brings it in and the governing section, using the 2021 IBC as the reference edition. The last column links to the DGA article that covers each topic in depth.

System or featureWhen it is requiredCode and section (2021 IBC unless noted)Where to read more
Sprinklers under the building codeEnclosed garage: fire area over 12,000 sq ft, or any size beneath another occupancy other than Group R-3. Open garage: fire area over 48,000 sq ft (no open garage item in the 2018 IBC). Any garage: a story with an occupant load of 30 or more located 55 ft or more above the lowest level of fire department vehicle access (the 2018 IBC exempted open parking structures). Commercial motor vehicle storage: fire area over 5,000 sq ft. Mechanical-access enclosed garage: any size. NYC: any building over 5,000 sq ft whose main use is parking.Sections 903.2.10, 903.2.10.1, 903.2.10.2 and 903.2.11.3; 2022 NYC Building Code Section 903.2.10When a parking garage needs sprinklers
Sprinklers under the fire code (Maryland and Delaware)New parking structures, open or enclosed, of any sizeNFPA 101 (2024) Section 42.8.3.5 in both states; NFPA 88A (2023) Section 6.4.1 in DelawareCovered in the sprinkler article in the first row
Sprinkler system typeWet pipe where all piping stays at 40 F or above; dry pipe, preaction or listed antifreeze where the piping can freezeNFPA 13 (2022) Section 16.4.1.1 and Chapter 8Wet, dry, preaction or deluge: which system fits
StandpipeFour or more stories above or below grade plane, the highest floor more than 30 ft above the lowest level of fire department vehicle access, or the lowest floor more than 30 ft below the highest level; open garages follow the same testSections 905.3.1 and 406.5.8When a building needs a standpipe
Standpipe class and typeClass I (fire department hose connections) allowed in parking garages; a dry standpipe only where the piping is subject to freezingSection 905.3.1, exception 3; Section 905.8; NFPA 14Wet, dry and manual standpipes compared
Freeze protectionSprinkler or standpipe piping in unheated space, such as open tiers, ramps and entrancesNFPA 13 (2022) Section 16.4.1.1 and Chapter 8; IBC Section 905.8The freeze protection section below
VentilationOpen garage: the wall openings only. Enclosed garage: a mechanical ventilation and exhaust system, except in a garage accessory to a one- or two-family dwellingSections 406.5.2, 406.5.10 and 406.6.2; International Mechanical Code Chapters 4 and 5Designed by the mechanical engineer; not a sprinkler item
Mechanical-access parkingAny enclosed garage where lifts or automated equipment move the vehiclesSection 406.6.4: 2-hour fire barriers or horizontal assemblies, mechanical smoke removal under Section 910.4, a fire control equipment room and fire department access doorsSprinkler trigger in the first row

Section numbers from the 2021 IBC. The 2024 edition (New Jersey, New York State, the City of New Castle in Delaware) keeps the Section 903.2.10 garage thresholds, and the 2018 edition (Kent County and Wilmington, Delaware) has no open garage item.

Sprinklers and standpipes run on separate triggers, so a garage can need one without the other. Height drives the standpipe (Section 905.3.1), while fire area and the uses above drive the sprinklers (Section 903.2.10), with a separate height trigger at 55 ft (Section 903.2.11.3).

How do electric vehicle charging and the 2024 codes change garage protection?

EV charging does not change the garage sprinkler thresholds in the model building code. The 2021 IBC sends charging systems, where provided, to NFPA 70, the National Electrical Code, with listed and labeled equipment (Section 406.2.7), and the International Code Council (ICC) lists no change to the Section 903.2.10 limits in its summaries of the 2024 IBC.

The 2024 codes add rules for the vehicles rather than the parking. The 2024 IBC sprinklers Group S-1 spaces that store or repair lithium-ion or lithium metal battery vehicles once the fire area exceeds 500 sq ft (Section 903.2), which can reach battery-electric bus and fleet garages but not a public garage in Group S-2 (Section 311.3). New York State’s 2025 fire code also includes emergency disconnects for EV charging stations (Fire Code of New York State Section 611), an electrical rule rather than a sprinkler trigger.

Fire codes and local amendments go further. NFPA 101 (2024) in Maryland and Delaware, and NFPA 88A (2023) in Delaware, call for sprinklers in every new parking structure, open or enclosed, and Montgomery County, Maryland, amends its fire code (Executive Regulation 14-24) so that an enclosed garage with EV charging stations is sprinklered at 0.3 gallons per minute (gpm) per sq ft over the fire area or 2,500 sq ft, whichever is smaller.

How is a garage sprinkler system protected against freezing?

NFPA 13 (2022) requires wet pipe sprinkler piping to be kept at 40 F or above (Section 16.4.1.1), so the open tiers, ramps and entrances of most garages in the region need a system that tolerates freezing. The usual answer is a dry pipe system, whose piping holds air or nitrogen until a sprinkler opens and a dry pipe valve in a heated room releases the water (Chapter 8). A heated garage can stay wet, with dry sprinklers or a small dry system serving the cold areas near the entrances. The 2025 edition, used in Delaware, drops the 40 F wording from Section 16.4.1.1, and its Section 16.4.1.1.1 uses the average annual extreme minimum temperature where the 2022 edition used the lowest one-day mean temperature.

Dry pipe systems change the design. NFPA 13 (2022) enlarges the design area by 30 percent for a dry pipe system (Section 19.2.3.2.5), which raises the water demand, and requires a system above 500 gal of capacity, or 750 gal with a quick-opening device, to meet a water delivery time limit (Section 8.2.3), so a large garage is usually split into several systems. New Jersey’s acceptance test amendment (IBC Section 903.5.1 as amended in New Jersey Administrative Code (N.J.A.C.) 5:23-3.14) also requires every dry pipe system to deliver water to the inspector’s test pipe within 60 seconds.

Preaction and antifreeze systems are the other options: a preaction system adds detection and a release panel, and any antifreeze system must use a listed solution (NFPA 25 (2023) Section 5.3.4.4). Montgomery County’s Department of Permitting Services goes further in its NFPA 13 submittal requirements and accepts a dry pipe system only where heat cannot prevent freezing.

What changes for bus terminals and transit stations?

A bus garage is not a public parking garage in the IBC’s sense. The 2021 IBC bars buses and trucks from open parking garages (Section 406.5.11), sprinklers buildings that store commercial motor vehicles once the fire area exceeds 5,000 sq ft (Section 903.2.10.1) and sends repair bays to the repair garage triggers in Section 903.2.9.1. New York’s Department of State has said the registered design professional classifies these buildings from the fleet makeup, vehicle density and cargo.

A bus terminal’s waiting room is Group A-3 (Section 303.4), sprinklered when the fire area exceeds 12,000 sq ft, the occupant load reaches 300 or the room is on a floor other than the level of exit discharge (Section 903.2.1.3). DGA’s guide to when a building needs fire sprinklers covers those occupancy thresholds.

Rail stations follow NFPA 130, the Standard for Fixed Guideway Transit and Passenger Rail Systems, where a code adopts it; the standard covers stations, trainways, emergency ventilation, vehicles, emergency procedures and communications. New York State applies the 2023 edition through the Uniform Code Provisions for Rail Stations (19 New York Codes, Rules and Regulations (NYCRR) 1228.3(c)), Delaware adopts the 2023 edition in Regulation 701, section 3.1, and the 2022 NYC Fire Code lists the 2020 edition in Chapter 80. In Pennsylvania, whose 2021 IBC does not list NFPA 130, and in New Jersey and Maryland, the standard’s role on a station project is settled with the AHJ early in design.

Opens the Project Desk with your sentence. Our licensed PEs review every brief and reply within one business day.

What drives the cost and schedule of garage fire protection (as of November 2026)?

As of November 2026, a short list of drivers sets most of the cost and schedule of garage fire protection. Most are fixed by the garage’s form, climate and neighbors rather than by its size.

  • Open or enclosed: an enclosed garage adds mechanical ventilation and reaches the sprinkler threshold at 12,000 sq ft of fire area instead of 48,000 sq ft.
  • Heated or unheated: dry pipe systems add heated valve rooms, air or nitrogen supplies, a 30 percent larger design area and more valves to keep each system within the Chapter 8 size and water delivery time rules.
  • Water supply: local margins, 10 psi in Delaware (Regulation 702, Chapter 4) and 20 percent on NFPA 13 calculations in Montgomery County, can tip a dry pipe design toward a fire pump.
  • Uses above: apartments, stores or offices over an enclosed garage bring sprinklers at any size and, on a podium, a 3-hour horizontal assembly between the two buildings.
  • Code layer: NFPA 101 in Maryland and Delaware, NFPA 88A in Delaware, the 5,000 sq ft line in NYC, the 2018 IBC in Kent County and Wilmington, and New Jersey’s grace period through February 17, 2027.
  • Review clocks: NYC (40 calendar days), New Jersey (20 business days) and Pennsylvania (30 business days on commercial work) set statutory limits, while New York State, Maryland and Delaware set no statewide clock; the jurisdiction table gives the sections.

DGA’s Fire Protection Project Timeline Estimator turns drivers like these into a schedule range for a specific project. Settling the checklist items before design starts keeps most of them out of plan review.

Figure 2: Garage fire protection checklist

1Test each tier against the open parking garage openings rule in IBC Section 406.5.2 and record the fire area of the tiers the ramps connect.
2List every use above, beside and below the garage, including apartments, stores and any podium arrangement.
3Confirm the code layer: the IBC edition, NYC Building Code Section 903.2.10, NFPA 101 (2024) in Maryland and Delaware, and NFPA 88A (2023) and Regulation 702 in Delaware.
4Map heated and unheated zones and pick wet, dry pipe, preaction or listed antifreeze for each, keeping each dry system within the NFPA 13 Chapter 8 size and water delivery time rules.
5Check the standpipe triggers in IBC Section 905.3.1 and agree the standpipe type, wet or dry, with the fire department.
6Flag EV charging, mechanical-access parking and bus or truck storage, each of which brings its own rules.
7Get a hydrant flow test from the last 12 months, the limit in every NFPA 13 edition in use (Section 4.5.1.1 in 2022 and 2025), and add any local margin, such as Delaware’s 10 psi.
8Agree the fire department connection location; in Delaware the fire company’s chief officer sets it in writing (Regulation 702, Chapter 4, section 1.3).
Eight facts settle most garage fire protection questions before design starts: open or enclosed under IBC Section 406.5.2, the uses around the garage, the adopted code layer, heated and unheated zones, the standpipe triggers in Section 905.3.1, EV charging and special vehicles, a flow test no more than 12 months old under every NFPA 13 edition in use, and the fire department connection location.

Who reviews and approves garage fire protection systems?

Garage sprinkler and standpipe drawings go through the building permit in most of the region, reviewed by the local code official in New York State and Pennsylvania, the fire protection subcode official in New Jersey and DOB in NYC. Maryland adds the fire marshal’s NFPA 1 and NFPA 101 review to the county permit, and Delaware sends the drawings to the Office of the State Fire Marshal. DGA’s guide to how a sprinkler plan review works covers the submittal, the comments and the sign-off.

The table lists the codes, the garage and transit rules beyond the model IBC, and the reviewer, filing and sign-off in each jurisdiction. Each jurisdiction inspects the systems before sign-off, and in Delaware the State Fire Marshal’s office witnesses the hydrostatic test and performs the acceptance test before the building is occupied.

JurisdictionCodes in force (as of November 2026)Garage and transit rules beyond the model IBCReviewer, filing and sign-off
New York City2022 NYC Building Code and Fire Code; NFPA 13 (2016) as modified by Appendix QSprinklers in any building over 5,000 sq ft whose main use is Group S-2, in every enclosed garage, and in open or enclosed garages beneath other uses except Group R-3 (Building Code Section 903.2.10); Fire Code Chapter 80 lists NFPA 88A (2019) and NFPA 130 (2020)DOB, with sprinkler and standpipe filings in DOB NOW: Build; approval or written notice within 40 calendar days of a complete application (Administrative Code Section 28-104.2.7); DOB Letter of Completion or certificate of occupancy
New York State (outside NYC)2025 Building Code of New York State on the 2024 IBC, in effect since December 31, 2025; NFPA 13 (2022)Section 903.2.10 of the state code, based on the 2024 IBC; NFPA 130 (2023) for rail stations (19 NYCRR 1228.3(c)); EV charging station disconnects in Fire Code of New York State Section 611; operating permits and condition assessments for parking garages (19 NYCRR Part 1203)City, town, village or county code enforcement official, with the building permit; no statewide review clock; certificate of occupancy or certificate of compliance
New JerseyUniform Construction Code (UCC) on the 2024 IBC, effective August 17, 2026; NFPA 13 (2022)New Jersey’s Section 903 amendments leave Section 903.2.10 unchanged; complete applications under the prior codes through February 17, 2027 stay on the 2021 IBC and New Jersey’s Table 903.2.13, which sprinklered Group S-2 buildings of construction Types IIB, IIIB and VB past set areas, open parking structures exceptedFire protection subcode official in the municipal construction office; the construction official acts within 20 business days (N.J.A.C. 5:23-2.16(a)) and issues the certificate of occupancy, or a certificate of approval for work in an existing building
PennsylvaniaUCC on the 2021 IBC since January 1, 2026; NFPA 13 (2019); no statewide fire code2021 IBC Chapter 9 adopted with one change, to Section 903.3.1.2 (NFPA 13R), so Section 903.2.10 applies as published; the 2021 IBC lists neither NFPA 88A nor NFPA 130Municipal code official or third-party agency, or the Department of Labor and Industry (L&I) where the municipality does not enforce the UCC; Philadelphia Fire Suppression Systems Permit and Pittsburgh Suppression Systems Permit; 30 business days on commercial applications (34 Pa. Code 403.43(a)); certificate of occupancy (34 Pa. Code 403.46), and in Philadelphia a Certificate of Approval closes the suppression permit
MarylandMaryland Building Performance Standards (2021 IBC) through the county permit; State Fire Prevention Code with NFPA 1 and NFPA 101 (2024)NFPA 101 (2024) Section 42.8.3.5: sprinklers in new parking structures of any size; Montgomery County: enclosed garages with EV charging stations sprinklered at 0.3 gpm per sq ft (Executive Regulation 14-24)County permit office, such as Montgomery County’s Department of Permitting Services, with the Office of the State Fire Marshal (OSFM); no statewide review clock
DelawareIBC by jurisdiction: 2021 in New Castle and Sussex counties, 2018 in Kent County and Wilmington, 2024 in the City of New Castle; Regulation 701 (2026) with NFPA 1 and NFPA 101 (2024) and NFPA 13 (2025)NFPA 88A (2023) and NFPA 130 (2023) adopted in Regulation 701, section 3.1; Regulation 702, Chapter 4, section 1.2 sprinklers buildings over 10,000 sq ft and exempts from that item open noncombustible NFPA 88A structures not beneath another use; 10 psi safety margin on hydraulic designs (section 1.3.1.5)Office of the State Fire Marshal plan review, or the city fire marshal in Wilmington, Dover, Newark and the City of New Castle; the State Fire Marshal’s office witnesses the hydrostatic test and performs the acceptance test; county or city certificate of occupancy; no published review clock

In Maryland, the county building permit reviews sprinklers to NFPA 13 (2019) through the 2021 IBC, while the State Fire Prevention Code (NFPA 1, 2024) references NFPA 13 (2022). Editions, offices and review clocks as of November 2026.

Key Takeaway: A parking garage’s fire protection follows from three facts: whether it is open or enclosed under IBC Section 406.5.2, what sits above it and whether its piping can freeze. Under the 2021 and 2024 IBC an enclosed garage gets mechanical ventilation and sprinklers above a 12,000 sq ft fire area or beneath any use other than Group R-3, an open garage gets sprinklers above 48,000 sq ft, standpipes follow Section 905.3.1 and cold piping takes a dry pipe, preaction or antifreeze design. NYC sprinklers parking buildings over 5,000 sq ft, and the Maryland and Delaware fire codes call for sprinklers in every new parking structure.

Frequently asked questions

Do open parking garages need sprinklers?

Conditional: under the 2021 and 2024 IBC an open parking garage needs sprinklers once its fire area exceeds 48,000 sq ft (Section 903.2.10), and under the 2021 IBC also once a story with an occupant load of 30 or more sits 55 ft or more above fire department vehicle access (Section 903.2.11.3). The 2018 IBC still used in Kent County and Wilmington, Delaware, has no open garage item and exempts open parking structures from the 55 ft rule. New York City sprinklers any building over 5,000 sq ft whose main use is parking, and in Maryland and Delaware NFPA 101 (2024), with NFPA 88A (2023) in Delaware, calls for sprinklers in new parking structures of any size.

Does an unheated garage need a dry pipe sprinkler system?

Conditional: an unheated garage needs a system that tolerates freezing, because NFPA 13 (2022) Section 16.4.1.1 requires wet pipe piping to be kept at 40 F or above. A dry pipe system is the usual choice, with preaction, a listed antifreeze solution or dry sprinklers fed from heated space as the alternatives, and a dry pipe design takes a 30 percent larger design area (Section 19.2.3.2.5).

Do parking garages need standpipes?

Conditional: a parking garage needs a standpipe when 2021 IBC Section 905.3.1 applies, for example at four or more stories above or below grade plane or with the highest floor more than 30 ft above the lowest level of fire department vehicle access, and Section 406.5.8 applies the same test to open garages. Parking garages may use Class I standpipes (Section 905.3.1, exception 3), and a dry standpipe is permitted only where the piping is subject to freezing (Section 905.8).

Does electric vehicle charging require more sprinklers in a garage?

No, not under the model building code: the 2021 IBC sends charging equipment to NFPA 70 (Section 406.2.7), and the Section 903.2.10 garage thresholds are the same with or without chargers. The 2024 IBC trigger at 500 sq ft applies to Group S-1 spaces that store or repair lithium-ion or lithium metal battery vehicles, not to a Group S-2 public garage. Local rules can add more, and Montgomery County, Maryland, calls for an enclosed garage with EV charging stations to be sprinklered at 0.3 gpm per sq ft over the fire area or 2,500 sq ft, whichever is smaller.

This article is general information, not a substitute for a project-specific code analysis. Code editions, local amendments and reviewer practice change; confirm the adopted code and the authority having jurisdiction for each project.

Designing Fire Protection for a Parking Garage?

Send the garage plans, the uses above and below it, which tiers are heated and the jurisdiction. DGA confirms which sprinkler, standpipe and freeze protection rules apply and designs the systems to the code the authority having jurisdiction enforces. Project briefs get confirmation and preliminary code feedback within one business day.

Send a project brief → View related services

Leave a reply

Your email address will not be published. Required fields are marked *

Quick inquiry

Ready when you are.

Your name, a way to reach you, and where the project is. A licensed PE replies within one business day. Every inquiry is confidential.

Prefer to describe it first? Open the Project Desk

FirmDGA Fire Protection Engineering
SheetFP-5212
OfficesNew York · Harrisburg · Seattle
LicensedNY NJ PA MD DE WA OR FL
Rev11.2026